Download  Print this page

Texas Instruments TPS650231EVM User Manual

Texas instruments computer hardware user manual
Hide thumbs

Advertisement

The characteristics, operation, and use of the TPS65023B/TPS650231EVM-664 evaluation module (EVM)
are described in this document. This EVM is designed to help the user evaluate and test the various
operating modes of the TPS65023B/TPS650231. This user's guide includes setup instructions for the
hardware and software, a schematic diagram, a bill of materials, and PCB layout drawings for the
evaluation module.
..................................................................................................................
1
2
3
4
5
1
2
3
4
5
6
1
2
3
4
1
Introduction
The Texas Instruments TPS65023B/TPS650231EVM is an integrated power management integrated
circuit (IC) for applications that are powered with one Li-ion or Li-polymer cell and require multiple power
rails. The TPS65023B/TPS650231 contains three highly efficient switching step-down converters, two
LDOs, and additional status and I/O pins. The device is controlled via an I
1.1
Requirements
In order for this EVM to operate properly, the following components must be connected and properly
configured.
1.1.1
Personal Computer
A personal computer with a USB port is required to operate this EVM. The TPS65023B/TPS650231
interface software, which is run on the personal computer (PC), communicates with the EVM via the PC
USB port. The user sends commands to the EVM as well as reads the contents of the
TPS65023B/TPS650231 internal registers through the USB port.
SLVU394 - October 2010
Submit Documentation Feedback
.....................................................................................
......................................................................................
................................................................................................................
..........................................................................................
.............................................................................................................
..........................................................................................................
..............................................................................................
................................................................................................
.....................................................................................................
.....................................................................................................
..............................................................................
..............................................................................
Copyright © 2010, Texas Instruments Incorporated
TPS65023B/TPS650231EVM
List of Figures
.........................................................................
List of Tables
...................................................................
User's Guide
SLVU394 - October 2010
2
C interface (HPA172).
TPS65023B/TPS650231EVM
1
2
3
6
11
6
7
8
9
10
11
2
2
2
12
1

Advertisement

Table of Contents
loading

  Related Manuals for Texas Instruments TPS650231EVM

  Summary of Contents for Texas Instruments TPS650231EVM

  • Page 1: Table Of Contents

    The characteristics, operation, and use of the TPS65023B/TPS650231EVM-664 evaluation module (EVM) are described in this document. This EVM is designed to help the user evaluate and test the various operating modes of the TPS65023B/TPS650231. This user’s guide includes setup instructions for the hardware and software, a schematic diagram, a bill of materials, and PCB layout drawings for the evaluation module.
  • Page 2: Slvu394 – October

    1.1.4 Software Texas Instruments provides software to assist the user in evaluating this EVM. To install the software, go to the Texas Instruments Web page and download the latest software version from the TPS65023B or TPS650231 product folder. Once you have downloaded the software, execute the setup file, and follow the instructions given.
  • Page 3: Input/Output Connector Description

    Input/Output Connector Description This section describes the jumpers and connectors on the EVM, as well as how to properly connect, set up, and use the TPS65023B/TPS650231EVM-664. J1 – VIN Input voltage from external power supply, recommended maximum 5.5 V. Input current depends on load but typically is less than 2 A.
  • Page 4 Setup The following steps must be followed before the EVM can be operated. 1. Install the TPS65023B/TPS650231EVM software. 2. Connect input voltages and loads to the EVM. 3. Configure all EVM jumpers to factory setting.
  • Page 5 Setting the Output Voltage for DCDC2, TPS650231 The TPS650231 does not feature these default output voltages. The output voltages of DCDC2 is externally adjustable only. The default configuration of the TPS650231EVM-664 is that R3 and R6 are not assembled. JP2 is not assembled.
  • Page 6: Board Layout

    Layout Board layout is critical for all switch mode power supplies. layout for the TPS65023B/TPS650231EVM-664 PCB. The nodes with high switching frequencies and currents are short and are isolated from the noise-sensitive feedback circuitry. Careful attention has been given to the routing of high-frequency current loops. See the data sheet for specific layout guidelines.
  • Page 7: Top Layer Routing

    Board Layout www.ti.com Figure 2. Top Layer Routing SLVU394 – October 2010 TPS65023B/TPS650231EVM Submit Documentation Feedback Copyright © 2010, Texas Instruments Incorporated...
  • Page 8: Layer-2 Routing, Gnd Plane

    Board Layout www.ti.com Figure 3. Layer-2 Routing, GND Plane TPS65023B/TPS650231EVM SLVU394 – October 2010 Submit Documentation Feedback Copyright © 2010, Texas Instruments Incorporated...
  • Page 9: Layer-3 Routing, Vin Plane

    Board Layout www.ti.com Figure 4. Layer-3 Routing, Vin Plane SLVU394 – October 2010 TPS65023B/TPS650231EVM Submit Documentation Feedback Copyright © 2010, Texas Instruments Incorporated...
  • Page 10: Bottom Layer Routing

    Board Layout www.ti.com Figure 5. Bottom Layer Routing TPS65023B/TPS650231EVM SLVU394 – October 2010 Submit Documentation Feedback Copyright © 2010, Texas Instruments Incorporated...
  • Page 11: Schematic And Bill Of Materials

    Schematic and Bill of Materials This section provides the TPS65023B/TPS650231EVM-664 schematic and bill of materials. Schematic Figure 6. TPS65023B/TPS650231EVM-664 Schematic SLVU394 – October 2010 Submit Documentation Feedback Copyright © 2010, Texas Instruments Incorporated Schematic and Bill of Materials TPS65023B/TPS650231EVM...
  • Page 12: Tps65023B/Tps650231Evm-664 Bill Of Materials

    Schematic and Bill of Materials Bill of Materials Table 4. TPS65023B/TPS650231EVM-664 Bill of Materials Count RefDes Value -001 -002 C1, C2, C4, C9, 10 µF C10, C11, C14–C16 C3, C6, C7, C17 1.0 µF 1500 pF C8, C18 2.2 µF L1, L2, L3 2.2 µH...
  • Page 13 Evaluation Board/Kit Important Notice Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 14: Important Notice

    Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete. All products are sold subject to TI’s terms and conditions of sale supplied at the time of order acknowledgment.

This manual is also suitable for:

Tps65023b