Download  Print this page

Texas Instruments TSC2007EVM User Manual

Texas instruments evaluation module user's guide
Hide thumbs

Advertisement

TSC2007EVM and TSC2007EVM-PDK User's Guide
This user's guide describes the characteristics, operation, and use of the
TSC2007EVM, both by itself and as part of the TSC2007EVM-PDK. This evaluation
module (EVM) is a 4-wire touch screen controller EVM which also has auxiliary input
and temperature measurement capabilities. A complete circuit description, schematic
diagram, and bill of materials are included.
The following related documents are available through the Texas Instruments Web site
at www.ti.com.
1
2
Analog Interface
3
4
5
6
7
8
9
1
TSC2007EVM-PDK Block Diagram
2
Default Software Screen
1
EVM-Compatible Device Data Sheets
2
Analog Interface Pinout
3
Digital Interface Pinout
4
Power Supply Pinout
5
Power Selection Options - JMP1
6
List of Jumpers
7
TSC2007EVM Bill of Materials
8
SLAU199 - March 2007
Submit Documentation Feedback
Table 1. EVM-Compatible Device Data Sheets
DEVICE
TSC2007
TAS1020B
REG1117-5
TPS767D318
SN74LVC125A
SN74LVC1G125
SN74LVC1G07
...............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
...............................................................................................................
.................................................................................................................
........................................................................................................
.................................................................................................
................................................................................................
......................................................................................
...................................................................................................
....................................................................................
.....................................................................................................
......................................................................................................
........................................................................................................
..........................................................................................
...............................................................................................................
.............................................................................................
..........................................................................................
LITERATURE NUMBER
SBAS405
SLES025
SBVS001
SLVS209
SCAS290
SCES223
SCES296
Contents
List of Figures
List of Tables
TSC2007EVM and TSC2007EVM-PDK User's Guide
User's Guide
SLAU199 - March 2007
2
2
3
3
4
5
9
11
11
6
7
1
2
3
3
3
5
9
10
1

Advertisement

Table of Contents
loading

  Related Manuals for Texas Instruments TSC2007EVM

  Summary of Contents for Texas Instruments TSC2007EVM

  • Page 1: Table Of Contents

    TSC2007EVM and TSC2007EVM-PDK User's Guide This user's guide describes the characteristics, operation, and use of the TSC2007EVM, both by itself and as part of the TSC2007EVM-PDK. This evaluation module (EVM) is a 4-wire touch screen controller EVM which also has auxiliary input and temperature measurement capabilities.
  • Page 2: Evm Overview

    Microsoft Windows™ operating systems. Introduction The TSC2007EVM is in the Texas Instruments modular EVM form factor, which allows direct evaluation of the performance and operating characteristics of the TSC2007, and eases software development and system prototyping.
  • Page 3: Digital Interface

    PENIRQ J2.16 J2.4, J2.10, J2.18 DGND J2.1-J2.19 (odd, except Unused J2.15) J2.20 Power Supplies J3 provides connection to the common power bus for the TSC2007EVM. Power is supplied on the pins listed in Table SIGNAL Unused Unused DGND +1.8VD +3.3VD When power is supplied to J3, JMP1 allows for one of two different DC voltages to be selected as power for the TSC.
  • Page 4: Evm Operation

    EVM system. Digital Control The digital control signals can be applied directly to J2 (top or bottom side). The modular TSC2007EVM also can be connected directly to a DSP or microcontroller interface board, such as the USB-MODEVM interface board if purchased as part of the TSC2007EVM-PDK.
  • Page 5: Kit Operation

    Analog power select (default is +3.3VD) EEPROM address select. When installed and used with the USB-MODEVM, firmware for the motherboard is executed from the EEPROM on the TSC2007EVM. This is the default mode. Figure 1. The evaluation kit consists of two circuit...
  • Page 6 USB-MODEVM. Quick Start Before installing the TSC2007EVM board on top of the USB-MODEVM board, check SW2-1, SW2-2, and SW2-3 on the USB-MODEVM board to ensure that at least one of these three is OFF Ensure that the TSC2007EVM is installed on the USB-MODEVM interface board. The TSC2007EVM should be installed in the topmost position, using J11, J12, and J13 on the USB-MODEVM.
  • Page 7 USB-MODEVM should light. Once this occurs, launch the TSC2007 evaluation software on your PC. It is suggested that users read the readme_install.txt file for up-to-date, step-by-step instructions. The software should automatically find the TSC2007EVM, and a screen similar to the one shown in Figure 2 should appear.
  • Page 8 EVM slot, which is connected to the TAS1020B digital audio interface, is not used. As configured from the factory, the board is ready to use with the TSC2007EVM except for SW2, in which case at least one of SW2-1, SW2-2, and SW2-3 must be set to OFF.
  • Page 9: Evm Bill Of Materials

    Every new reading is a new row in the file. EVM Bill of Materials Table 7 Table 8 contain a complete bill of materials for the modular TSC2007EVM evaluation board and the USB-MODEVM interface board, respectively (included only in the TSC2007EVM-PDK). Reference Designator Description R2, R3 2.7k...
  • Page 10: Usb-Modevm Bill Of Materials

    U5, U6, U7 Single IC Buffer Driver with Open Drain o/p Single Tri-State Buffer 64K 2-Wire Serial EEPROM USB-MODEVM PCB TSC2007EVM and TSC2007EVM-PDK User's Guide Table 8. USB-MODEVM Bill of Materials Manufacturer 1/10W 5% Chip Resistor Panasonic 1/16W 1% Chip Resistor Panasonic...
  • Page 11: Tsc2007Evm Schematic

    ED555/2DS CUI Stack PJ-102B AMP/Tyco 414305-1 Samtec TSM-110-01-L-DV-P Samtec SSW-110-22-F-D-VS-K Samtec TSM-105-01-L-DV-P Samtec SSW-105-22-F-D-VS-K Samtec TSW-102-07-L-D TSW-106-07-L-D Samtec TSW-102-07-L-S Samtec TSW-102-07-L-S Samtec TSW-103-07-L-S Samtec TSW-103-07-L-D C&K Division, ITT TDA02H0SK1 C&K Division, ITT TDA08H0SK1 Samtec SNT-100-BK-T TSC2007EVM and TSC2007EVM-PDK User's Guide...
  • Page 12 Digital Interface 0.1uF 24AA64I/SN JMP2 DATA ACQUISITION PRODUCTS HIGH-PERFORMANCE ANALOG DIVISION SEMICONDUCTOR GROUP 12500 T.I. Boulevard, Dallas, Texas 75243 USA TITLE ENGINEER WENDY FANG TSC2007EVM DRAWN BY STEVE LEGGIO DOCUMENT CONTROL NO.6486825 SIZE DATE 5-Jan-2007 SHEET FILE REVISION HISTORY APPROVED...
  • Page 13 IOVDD ZXMN6A07F 2.7K ZXMN6A07F EXTERNAL I2C +3.3VD TP10 24LC64I/SN USB SLAVE CONN 1.5K 27.4 897-30-004-90-000000 27.4 47pF ED555/2DS EXT PWR IN 6VDC-10VDC IN JMP6 PWR SELECT REG1117-5 VOUT DL4001 0.1uF 0.33uF CUI-STACK PJ102-B 2.5 MM +5VD IOVDD JMP7 +3.3VD +1.8VD IOVDD SELECT +3.3VD 2.7K...
  • Page 14 A0(-) A0(+) A1(-) A1(+) A2(-) A2(+) A3(-) A3(+) AGND AGND AGND VCOM AGND REF- AGND REF+ DAUGHTER-ANALOG J11A (TOP) = SAM_TSM-110-01-L-DV-P J11B (BOTTOM) = SAM_SSW-110-22-F-D-VS-K +5VA +5VD JMP1 JPR-2X1 -5VA +5VA +5VD 10uF 10uF 10uF -5VA +5VA +5VD SML-LX0603GW-TR SML-LX0603GW-TR GREEN GREEN A0(-)
  • Page 15 EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 16: Important Notice

    TI as compliant with ISO/TS 16949 requirements. Buyers acknowledge and agree that, if they use any non-designated products in automotive applications, TI will not be responsible for any failure to meet such requirements. Following are URLs where you can obtain information on other Texas Instruments products and application solutions: Products Amplifiers amplifier.ti.com...

This manual is also suitable for:

Tsc2007evm-pdk