Step 5. Optional Blower Kit Wiring - Superior SSDVPF-CNE-B Installation Instructions Manual

Ssdv direct-vent gas fireplaces
Hide thumbs Also See for SSDVPF-CNE-B:
Table of Contents

Advertisement

5. Install a field-provided strain relief in the
cabinet knockout opening for the protection
of the power supply wires.
6. Connect the power supply wires to the
receptacle as shown in Figure 46 on Page
26.
7. Connect the ground supply wire to the green
wire attached to the outlet receptacle's
green ground screw.
8. Wire and install the outlet receptacle to
junction box. Next, install into the chosen
corner of the control compartment as shown
in Figure 45.
9. After the receptacle/junction box wiring is
complete, install the field-provided metal
junction box cover plate (see Figure 45).
Note: The supplied 15 feet of 2 conductor
wire has one end of each conductor con-
nected to the gas valve circuit and the other
end of each conductor placed loose on top
of the appliance.
IMPORTANT NOTE
The gas valve OFF/ON switch is
shown in Figure 46 on Page 26. It
is integral with the gas valve and
should be set to the ON position.
Receptacle, Junction Box
and Cover Plate Installation
Junction Box
View Of Right
Bottom Corner Of Unit
Field-provided Metal Junction Box
Cover Plate With Screw
Junction Box
knock-out (2
places each side)
Press snap
bushing into the
knock-out for
control switch
wires.
Figure 45
26
• Remove the carton support from
the control compartment before
operating the appliance.
• Ensure that wires are positioned
away from hot surfaces and sharp
edges.
• Do not connect the optional wall
switch to a 120 Volt AC power
supply.
Outlet Receptacle
Pilot Burner
Assembly
BL
BL
Optional Control Switch
Fireplace
Side
Electronic Wiring Diagram (Honeywell) Showing Blower Wiring for Optional FBK-100, FBK-200 & FBK-250 Kits
Figure 46
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
CAUTIONS
Plug blower
Green
into this
receptacle
Blower
Ground
Tab Intact
Green
Neutral
Ground
Side of
Screw
Receptacle
View A
J-Box Wiring when
Relay Module C/W FBK-250 only. Plug blower
using unit mounted
into J-Box receptacle for FBK-100 or FBK-200
relay module.
application. See View A for J-Box wiring.
BK
W
G
Optional Blower
Junction Box
*OFF/ON Switch
(Integral with
Gas Valve)
Honeywell
Electronic
Gas
Valve
Igniter
Connector
BL
BK
R
BK
BK = BLACK BL = BLUE
BK
R = RED
W
G = GREEN
Schematic Representation Only
Step 5. WIRING - OPTIONAL FORCED AIR
BLOWER KIT
FBK-100, FBK-200 and FBK-250 Kits
(See Figure 46 for wiring) -
An electrical receptacle is provided for the
installation of the FBK-100, FBK-200 and FBK-
250 forced air blower kits. Electrical power
must be connected to this receptacle in order
to operate these blowers. Install the blower
kits according to the installation instructions
provided with the kits.
White
Black
Tab
Broken
Red
Hot
Side of
Receptacle
* Leave the OFF/ON switch, which is
integral with the gas valve, in the ON
GROUND
position.
Transformer
**Optional Control Switches: Wall
Switch, Wall Thermostat or Remote
Control Receiver.
24 V
120 VAC
Secondary
Notes:
Primary
1. If any of the original wire as supplied
must be replaced, use Type AWM 105°C
- 18 gage wire ONLY.
2. 120 VAC, 60 Hz - Less than 3 Amps.
W = WHITE
Caution: label all wires prior to
disconnection when servicing controls.
Field Wired
Wiring errors can cause improper and
Factory
dangerous operation.
Wired
G
o r
n u
- d
G
e r
n e
N
e
t u
a r
- l
W
h
e t i
120 VAC - Black
Junction Box
* Wall-mounted
ON/ OFF Blower
Switch or Variable
Speed Control Switch.
J-BOX WIRING FOR
WALL SWITCH
BLOWER CONTROL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ssdvpf-cnm-bSsdvst-cne-bSsdvst-cnm-b

Table of Contents