Commissioning the switchgear

Installing and starting up the switchgear is an important event for the System Administrator. The
following steps must be followed when commissioning the switchgear.
• Step 1: Reset Passwords.
See
• Step 2: Set User Settings.
See DEH-231 Entellisys Low Voltage Switchgear System User Manual.
• Step 3: Set Local HMI flags.
See
• Step 4: Set System Time Synchronization.
See
• Step 5: Configure System for Remote Communications.
See
Passwords on page
13.
Local HMI on page
17.
Time synchronization on page
Configuring the switchgear for remote communications on page
19.
21.