Gateway E-9722R User Manual page 54

Table of Contents

Advertisement

To install an optional mezzanine board:
1
2
3
4
5
6
7
To remove an optional mezzanine board:
1
2
3
4
5
6
48
CHAPTER 4: Installing Components
Follow the instructions in
that you turn off the server, then unplug the power cord(s) and all other cables connected
to the server.
Follow the instructions in
Remove the PCI riser assembly by following the instructions in
PCI expansion cards" on page
Align the holes on one side of the mezzanine board with the plastic standoffs and align
the other side with the mezzanine board slots (1).
Push down on the card (2) to seat it in the mezzanine board slot and onto the plastic
standoffs until the retaining tabs snap into place.
Replace the PCI riser card assembly by following the instructions in
PCI expansion cards" on page 34.
Follow the instructions in
Follow the instructions in
that you turn off the server, then unplug the power cord(s) and all other cables connected
to the server.
Follow the instructions in
Remove the PCI riser assembly by following the instructions in
PCI expansion cards" on page
Push aside the plastic retaining tabs (1) and pull the mezzanine board (2) out of the
mezzanine board slot.
Replace the PCI riser card assembly by following the instructions in
PCI expansion cards" on page 34.
Follow the instructions in
"Preventing static electricity discharge" on page
"Opening the server case" on page
34.
"Closing the server case" on page
"Preventing static electricity discharge" on page
"Opening the server case" on page
34.
"Closing the server case" on page
24. Make sure
25.
"Installing and removing
"Installing and removing
27.
24. Make sure
25.
"Installing and removing
"Installing and removing
27.

Advertisement

Table of Contents
loading

Table of Contents