Transfer Operation; 3.4 Manual - Generac Power Systems 8KW Owner's Manual

8, 10, 12, 14, 16, 17 & 20kw air-cooled automatic standby generators
Hide thumbs Also See for 8KW:
Table of Contents

Advertisement

2.
Auto
, Will start
and
run if Utility fails for 10 consecu-
tive seconds.
, Will
start
a five
(5)
second
engine
warm-up
timer.
, Will not transfer
if utility
subsequently
returns.
, Will transfer
to generator
if utility is still not pres-
ent.
, Will transfer
back
to utility
once
utility
returns
(above
75% of nominal)
for 15 seconds.
, Will transfer
back
to utility
if the generator
is
shut
down for any reason
(such
as the switch
is
in the OFF position
or a shutdown
alarm.
, After transfer,
will shut down engine after one (1)
minute
cool-down
time.
3.
Exercise
, Will not exercise
if generator
is already
running
in either
Auto or Manual
mode.
, During
exercise,
the controller
will only transfer
if utility fails during
exercise
for 10 seconds,
and
will switch
to Auto mode.
. .4
TILITY RE T RED
Initial
Condition:
Generator
supplying
power
to
customer
load.
When the utility
returns
(above
75%
of nominal),
a 15 second
return
to utility
timer
will
start.
At the completion
of this
timer,
if the utility
supply
is still
present
and
acceptable,
the control
will transfer
the load back
to the utility
and run the
engine
through
a one (1) minute
cool
down
period
and then
shut
down.
If utility
fails for
three
(3) sec-
onds
during
this cool down
period,
the control
will
transfer
load
back
to the generator
and
continue
to
run while monitoring
for utility to return.
3.4 MANUAL
TRANSFER OPERATION
@
3.4.1 TRANSFER
TO GENERATOR
POWER
SOURCE
To start
the generator
and activate
the transfer
switch
manually,
proceed
as follows:
1.
Set the generator's
AUTO/OFF/MANUAL
switch
to
OFE
2.
Set the
generator's
main
circuit
breaker
to its
OFF (or OPEN) position.
3.
Turn
OFF the utility
power
supply
to the transfer
switch
using the means
provided
(such as a utility
main line circuit
breaker).
Section 3 - Operation
Air-cooled Generators
OPERATION
Ax
-A A
Do not attempt
to activate
the transfer
switch
manually
until all power voltage supplies to the
switch have been positively
turned
off. Failure
to turn off all power voltage supplies may result
in extremely
hazardous
and possibly fatal elec-
trical shock.
4.
Use
the manual
transfer
handle
inside
the trans-
fer
switch
to
move
the
main
contacts
to
their
STANDBY
position,
i.e.,
loads
connected
to the
standby
power
source
(Figure
3.3).
5.
To crank
and
start
the engine,
set the AUTO/OFF/
MANUAL
switch
to MANUAL.
6.
Let the
engine
stabilize
and
warm
up
for
a few
minutes.
7.
Set the generator's
main
circuit
breaker
to its ON
(or CLOSED)
position.
The
standby
power
source
now
powers
the loads.
Figure
3.3 - Manual
Transfer
Switch
Operation
LOAD CONNECTED TO UTILITY POWER SOURCE
LOAD CONNECTED TO STANDBY POWER SOURCE
MANUAL TRANSFER
HANDLE
TRANSFER SWITCH
OPERATING LEVER
@ 3.4.2 TRANSFER BACK TO UTiLiTY POWER
When
utility
power
has
been
restored,
transfer
back
to that
source
and
shut
down
the generator.
This
can
be accomplished
as follows:
1.
Set
the
generator's
main
circuit
breaker
to
its
OFF
(or OPEN)
position.
2.
Let the engine
run
for a minute
or two at no-load
to stabilize
the
internal
temperatures.
3.
Set
the
generator's
AUTO/OFF/MANUAL
switch
to its OFF
(or OPEN)
position.
The
engine
should
shut
down.
4.
Check
that
utility
power
supply
to the
transfer
switch
is turned
OFE
t9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

14kw20kw17kw10kw12kw16kw

Table of Contents