Engine Governoradjustment; Operation; Break-In Procedure; Section 3 - Operation - Carrier ASPAX1CCA015 Installation And Owner's Manual

Air-cooled automatic standby generators 13 kw ng, 15 kw lp
Hide thumbs Also See for ASPAX1CCA015:
Table of Contents

Advertisement

OPERATION
Section 3 - Operation
IS kW Generator
2°7
ENGINE GOVERNORADJUSTMENT
If both AC l_-equeney
and voltage
are eorrespondtagly
high or low, adjust
tile engine governor
as follows:
2.7,1
15 KW UMTS
1.
Loosen
governor
clamp
bolt (See Figure
2.3).
Figure
2,3 --
V-twin
Engine
Governor
Adjustment
Gevemor Clamp £Nt
2.
Completely
remove
the idle spring.
3.
With governor
arm at wide open throttle
position,
rotate
governor
shaft
ikflly clockwise.
Tighten
clamp
bolt to 84 taeh-pounds.
4.
Start unit and apply frill load. Use full load speed
adjust
screw
{Figure
2.4) to adjust
frequency
to
58 Hz.
5.
Remove
load, stop engtae,
loosen
the idle adjust
screw and reconnect
the idle sprtag.
(3. Push the governor
arm to the closed
throttle
posi-
tion. Make sure the idle spring
does not stretch
at
all.
7.
Restart
the unit.
8.
Slowly turn
the idle adjust
screw to adjust
the no-
load idle fi-equeney
to 63-63.5
Hz.
9.
The governor
is now set.
Figure
2,4 --
V-twin
Fuff Load Speed Adjust
Screw
12
2.8
VOLTAGEREGULATOR
With
the
Irequeney
between
62-63.5
Hertz,
slowly
turn
the
slotted
potentiometer
(Figure
2.5)
until
line
voltage
reads
244-252
volts.
NOTE:
Remove
the
access
panel
on top
of the
control
panel
to adjust
the voltage
regulator.
Figure
2.5 - Voltage
A djustmen
t Po ten tiometer
HHHHHHI
[]
o
_©'
i
L
NOTE:
The voltage
reg_ator
is housed
above the generator's
control
panel.
The regulator
maintains
a voltage
in
direct
proportion
to frequency.
For example,
at 62
Hertz,
line-to-neutral
voltage
will be 124 volts.
3.1
BREAK4N PROCEDURE
Once the unit
has been tastalfed
and all electrical
cheeks have been made, it is strongly
recommended
that the followtag
"Break-ta
Procedure"
be completed
to ensure correct generator
operation
ta the future.
1.
Set the generator's
AUTO/OFF/MANUAL
switch
to
AUTO.
2.
Turn OFF the utility
power
supply
to the transfer
switch
ustag the means
provided
(such
as a utility
mata
ltae circuit
breaker).
3.
The unit
will start,
and
the transfer
switch
will
transfer
to standby.
4.
Ustag
the
transfer
swifeifs
built-ta
emergency
load center,
mrn on circuits
to load the generator
to approximately
25% rated
load and run the unit
%r one hour.
5.
Run the unit for one hour
at 50% rated
load.
6.
Run the unit for one hour
at 75% rated
load.
7.
Run the unit for one hour
at 100% rated
load.
8.
_[_lrn ON the utility
power
supply
to the transfer
switch,
which
will allow
the transfer
switch
to
transfer
back
to utility
powen
The unit will con-
tinue to run for one mtaute
and then shut down.