Checklist For Completed Installation; Table 21 Electrical Data - Quiet-Line Models (95°F/35°C) 50Hz - Emerson Liebert Prop Fan Condensing Unit Installation, Operation And Maintenance Manual

Liebert prop fan condensing unit
Table of Contents

Advertisement

Table 21
Electrical data - Quiet-Line models (95°F/35°C) 50Hz
Nominal
Capacity
Model #
Tons
Characteristic
13
1
19
1.5
26
2
36
3
41
3.5
66
5
95
8
*
FLA = Full Load Amps
2.8

Checklist for Completed Installation

___ 1. All items unpacked and checked.
___ 2. Proper clearances for service access maintained around equipment.
___ 3. Equipment is level and mounting fasteners are tight.
___ 4. Piping completed to refrigerant loop.
___ 5. All piping connections are tight.
___ 6. Piping routed to prevent chafing and rub-through.
___ 7. Piping has been evacuated and refrigerant charge added (if required).
___ 8. Line voltage to power wiring matches equipment nameplate.
___ 9. Power wiring connections completed, including earth ground.
___ 10. Power line circuit breakers or fuses have proper ratings for equipment installed.
___ 11. Control wiring connections completed.
___ 12. All wiring connections are tight.
___ 13. Foreign materials have been removed from area: in and around all equipment installed
(shipping materials, construction materials, tools, etc.).
___ 14. Fans and blowers rotate freely and in the proper direction.
___ 15. Blank startup sheet has been sent with the evaporator unit and is ready to be completed by
the installer.
Input Voltage-Phase
* Electrical
220-1
FLA
FLA
FLA
12.3
FLA
18.0
FLA
FLA
FLA
200/230-3
380/415-3
4.8
6.9
17.3
8.4
22.5
12.4
24