World Class 3000
INSTALLATION FOR METAL
WALL STACK OR DUCT
CONSTRUCTION
MTG HOLES
SHOWN ROTATED
o
22.5 OUT OF
TRUE POSITION
WELD OR BOLT MOUNTING
PLATE TO METAL WALL
OF STACK OR DUCT.
JOINT MUST BE AIRTIGHT.
WELD OR BOLT MOUNTING
PLATE TO METAL WALL
OF STACK OR DUCT.
JOINT MUST BE AIRTIGHT.
Rosemount Analytical Inc.
A Division of Emerson Process Management
0.50 (13)
3.75 (95)
MIN DIA HOLE
IN WALL
STACK OR DUCT
METAL WALL
ABRASIVE SHIELD MOUNTING
3.25 (82.5)
MIN DIA HOLE
IN WALL
STACK OR DUCT
METAL WALL
PROBE MOUNTING
Figure 2-1. Probe Installation (Sheet 4 of 5)
INSTALLATION FOR MASONRY
WALL STACK CONSTRUCTION
BOLT ADAPTOR
PLATE TO OUTSIDE
WALL SURFACE
FIELD WELD
PIPE TO
ADAPTOR PLATE
MTG HOLES
SHOWN ROTATED
o
22.5 OUT OF
TRUE POSITION
JOINT MUST
BE AIRTIGHT
OUTSIDE WALL
SURFACE
NOTE: ALL MASONRY STACK WORK AND JOINTS EXCEPT
ADAPTOR PLATE NOT FURNISHED BY ROSEMOUNT.
BOLT MOUNTING
PLATE TO OUTSIDE
WALL SURFACE
JOINT MUST
BE AIRTIGHT
OUTSIDE WALL
SURFACE
NOTE: DIMENSIONS IN INCHES WITH
Instruction Bulletin
106-300NE Rev. 3.4
May 2000
0.50 (13)
4.50 (114)
O.D. REF
PIPE 4.00 SCHED 40
PIPE SLEEVE (NOT
BY ROSEMOUNT)
LENGTH BY CUSTOMER
MASONRY
STACK WALL
FIELD WELD
PIPE TO
ADAPTOR PLATE
4.0 (102)
O.D. REF
PIPE 3.5 SCHED 40
PIPE SLEEVE (NOT
BY ROSEMOUNT)
LENGTH BY CUSTOMER
MASONRY
STACK WALL
MILLIMETERS IN PARENTHESES.
P0038
Installation
2
2-5