Step 5 — Checklist
1. Put away tools and instruments. Clean up debris.
2. Verify that switches for LHT and OFF- -DELAY are
blower OFF- -DELAY are selected as desired.
3. Verify that blower and burner access doors are properly
installed.
4. Cycle test furnace with room thermostat.
5. Check operation of accessories per manufacturer fs
instructions.
6. Review User's Guide with owner.
7. Attach literature packet to furnace.