Installing A Hot-Swap Hard Disk Drive - IBM 783722U Installation And User Manual

User manual
Hide thumbs Also See for 783722U:
Table of Contents

Advertisement

16. Reinstall the fan cage assembly. Align the fan cage assembly over the fan
17. Rotate the power-supply cage assembly back into the server. Press the
18. Close the bezel.
If you have other options to install or remove, do so now; otherwise go to
"Completing the installation" on page 97.

Installing a hot-swap hard disk drive

Some server models come with hot-swap SAS or SATA hot-swap hard disk drives.
Before you install a hot-swap hard disk drive, read the following information:
v The hot-swap drives must be either all SAS hard disk drives or all SATA hard
v The hot-swap hard disk drive models come with the following drives (depending
v The sequence for installing the 3.5-inch hard disk drives in the four-bay models is
v The sequence for installing the 2.5-inch hard disk drives in the eight-bay models
v The hot-swap drives are arranged horizontally in the standard hard disk drive
v Inspect the drive tray for signs of damage.
v Make sure that the drive is correctly installed in the tray.
v You do not have to turn off the server to install hot-swap drives in the hot-swap
v All hot-swap drives must have the same throughput speed rating; mixing speed
v The drive ID for each hot-swap hard disk drive is printed on the bezel.
v To maintain proper system cooling, do not operate the server for more than 10
Attention:
the server is powered-on might cause the server to stop, which could result in the
loss of data. To avoid this potential problem, always use an electrostatic-discharge
wrist strap or other grounding system when working inside the server with the
power on.
cage assembly slot and with the connector on the system board. Lower the fan
cage assembly into the chassis and press down firmly until the fan cage
assembly is seated firmly in place.
Note: Make sure that all wires and cables inside the server are routed
correctly before installing the fan cage assembly. Wiring that is not properly
routed could be damaged or might prevent the fan cage assembly from seating
properly in the server.
power-supply cage release tab and rotate the power-supply cage assembly
into the chassis.
disk drives; do not mix SAS and SATA drives in the server.
on your model):
– Four 3.5-inch hot-swap SAS or SATA hard disk drives
– Eight or sixteen 2.5-inch hot-swap SAS or SATA hard disk drives
to install the drives starting from the left bay (bay 4) and go to the right bay (bay
7) in that order.
is to install the drives starting from the right bay (bay 4) and go to the left bay
(bay 11) in that order.
cage; the drive numbers are 0 through 7 (right to left) on models with eight hard
disk drives and 8 through 15 (right to left) on servers with 16 hard disk drives.
When you install hard disk drives, start with drive 0.
drive bays.
ratings might cause all drives to operate at the lower throughput speed.
minutes without either a drive or a filler panel installed in each drive bay.
Static electricity that is released to internal server components when
Chapter 2. Installing optional devices
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

X3400 m2 7836X3400 m2 7837

Table of Contents