Figure 24. Raising The Locking Bar; Figure 25. Installing Processors - Intel SE7501HG2 Product Manual

Product guide
Hide thumbs Also See for SE7501HG2:
Table of Contents

Advertisement

3. Raise the locking bar on the processor socket.
4. Aligning the pins of the processor with the socket, insert the processor into the socket.
NOTE
Make sure the alignment triangle mark and the alignment triangle cutout
align correctly.
Installations and Upgrades
Figure 18. Raising the Locking Bar
Figure 19. Installing Processors
OM14132
OM14133
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents