Figure 7. Attaching The Rack-Mount Brackets To The Switch (Continued); Figure 8. Mounting The Switch In An Equipment Rack - Allied Telesis AT-GS950/8 Installation Manual

Allied telesis - websmart 8-port gigabit switch
Hide thumbs Also See for AT-GS950/8:
Table of Contents

Advertisement

Chapter 2: Installation
38

Figure 7. Attaching the Rack-Mount Brackets to the Switch (Continued)

3. Mount the switch in a standard 19-inch equipment rack using four
equipment rack screws (not provided with the switch).

Figure 8. Mounting the Switch in an Equipment Rack

4. Go to "Installing Optional SFP Transceivers" on page 42 or "Cabling
the Switch" on page 45.

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs950/16At-gs950/24

Table of Contents