Download Print this page

Applying Power To The Server - HP tc2100 Readfirst Sheet

Hp tower server tc2100 readfirst sheet
Hide thumbs Also See for tc2100:

Advertisement

ReadFirst Sheet for HP Tower Server tc2100
6d) Add PCI Accessory Boards
6e) Replace the covers

Applying Power to the Server

7) Check/Set the Power Supply Input
Voltage
CAUTION
To prevent damage to the power supply,
set the input voltage switch on the power
supply to the correct input line voltage
before connecting the power cord to an AC
voltage source.
HP Part Number P4648-90004, Doc # P4648-90004-1
Printed in August 2001
l
You can install additional accessory boards, but don't install third party
boards until you have verified the Server's operations.
l
The addition of a disk drive controller board, when not shipped with the
Server from the factory, may affect boot order and prevent you from
successfully verifying the Server's operation.
For details refer to Chapter 6, "Installing Additional Boards" in the HP
Server tc2100 Installation Guide.
l
Ensure all cables are properly routed and all components are fully seated,
before replacing covers.
For details refer to Chapter 3, "Opening and Closing the HP Server" in the
HP Server tc2100 Installation Guide.
l
Check the input voltage switch on the power supply located at the rear of
the Server below the power connector, as shown below.
The input voltage switch has two positions: 115 or 230 volts – 230 volts is
the default position.
Power
Connector
(Switch shown in
115 volts position.)
Input Voltage
Switch
'!#!%(&
!'

Advertisement

loading

This manual is also suitable for:

Tower server tc2100