HP Rp3440-4 - 9000 - 0 MB RAM Manual page 40

Site preparation guide
Hide thumbs Also See for Rp3440-4 - 9000 - 0 MB RAM:
Table of Contents

Advertisement

General Site Preparation Guidelines
Sample Site Inspection Checklist
Table 2-5
Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date
26.
Are there any equipment servicing hazards
(loose ground wires, poor lighting, and so on)?
No.
Area or condition
27.
Can cooling be maintained between 20°C and 55°C (up to
5,000 ft.)? Derate 1°C/1,000 ft. above 5,000 ft. and up to
10,000 ft.
28.
Can temperature changes be held to 10°C per hour with
tape media? Can temperature changes be held to 20°C per
hour without tape media?
29.
Can humidity level be maintained at 40% to 60% at 35°C
noncondensing?
30.
Are air conditioning filters installed and clean?
No.
Area or condition
31.
Are cabinets available for tape and disc media?
32.
Is shelving available for documentation?
No.
Area or Condition
33.
Are personnel enrolled in the System Administrator's
Course?
34.
Is on-site training required?
40
Cooling
Yes
Storage
Yes
Training
Comment or Date
No
No
Chapter 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp3440Rp34109000 rp34109000 rp3440

Table of Contents