Unpacking and Inspecting
This section describes what to do before unpacking the server and how to unpack the system itself.
WARNING
Do not attempt to move the cabinet, either packed or unpacked, up or down an
incline of more than 15
Verifying Site Preparation
Verifying site preparation includes two tasks: gathering LAN information and verifying electrical
requirements.
Gathering LAN Information
The SMS connects to the customer's LAN. Determine the IP of the appropriate address.
Verifying Electrical Requirements
The site should have been verified for proper grounding and electrical requirements prior to the system being
shipped to the customer as part of the site preparation. Before unpacking and installing the system, verify
with the customer that grounding specifications and power requirements have been met.
Checking the Inventory
The sales order packing slip lists all equipment shipped from HP. Use this packing slip to verify that all
equipment has arrived at the customer site.
NOTE
To identify each item by part number, refer to the sales order packing slip.
One of the large overpack containers is labeled "Open Me First." This box contains the Solution Information
Manual and DDCAs. The unpacking instructions are in the plastic bag taped to the cabinet.
The following items are in other containers and should be checked against the packing list:
•
Power Distribution Control Assembly (PDCA) and power cord
•
Two blower housings per cabinet
•
Four blowers per cabinet
•
Four side skins with related attachment hardware
•
Cabinet blower bezels and front door assemblies
•
Support Management Station
•
Cables
•
Optional equipment
•
Boot device with HP-UX, Windows, and/or Linux installed.
Chapter 2
o
Installing the System
Unpacking and Inspecting
23