Rack The Switch; Attaching The Rails To The Switch; Installing The Rear Mounting Brackets; Installing The Switch And Rail Assembly - HP StorageWorks 8/20q Installation And Reference Manual

Hp storageworks 8/20q fibre channel switch installation and reference guide (5697-7196, february 2008)
Hide thumbs Also See for StorageWorks 8/20q:
Table of Contents

Advertisement

Rack the switch

1.
Remove and discard the four 10-32 screws from the sides of the switch.
2.
Attach each rail to the switch using two 10-32 x .375-inch screws with captive washers
Make sure the slotted ends of the rails are on the power-supply side (not the SFP-port side) of the switch.
Figure 7

Attaching the rails to the switch

3.
On the rack vertical posts, mark the holes that will be used by the rail flanges (three on each rear
vertical post, two on each front vertical post). Then, from the inside of each vertical post, insert an M6
cage-nut for the rack you are using (square or round hole) into each marked hole
Fasten each rear mounting bracket to the marked holes, using two M6 machine screws.
Figure 8

Installing the rear mounting brackets

4.
Place the switch and rail assembly into the rack through the front, guiding the slotted-rail ends onto the
threaded studs of the rear mounting brackets
holes between the two cage-nuts on each of the front vertical rack posts.
Figure 9

Installing the switch and rail assembly

(Figure
9). Fit the posts on the front rail flanges in the
8/20q Fibre Channel Switch installation and reference guide
(Figure
7).
(Figure
8).
31

Advertisement

Table of Contents
loading

Table of Contents