Installing A Switch; Mount The Switch; Before You Begin - HP StorageWorks 8/20q Installation And Reference Manual

Hp storageworks 8/20q fibre channel switch installation and reference guide (5697-0410, june 2010)
Hide thumbs Also See for StorageWorks 8/20q:
Table of Contents

Advertisement

Installing a switch

Unpack the switch and accessories. The 8/20q Fibre Channel Switch product is shipped with the following
components
One Read-Me-First document
One End User License Agreement (EULA)
HP StorageWorks 8/20q and SN6000 Fibre Channel Switch Rack-Mount Kit quick start installation
instructions
HP StorageWorks 8/20q and SN6000 Fibre Channel Switch quick start installation instructions
One HP StorageWorks Simple SAN Connection Manager software CD
One HP StorageWorks 8/20q Fibre Channel Switch
One HP StorageWorks 8/20q and SN6000 Fibre Channel Switch Rack-Mount Kit
One standard power cord
One HP Power Distribution Unit (PDU) power cable
One serial cable
Four adhesive rubber feet
For the latest product information, including firmware, documentation, and supported SAN configurations,
visit the following HP web site: http://www.hp.com/go/8Gb-SSC.
Installing a 8/20q Fibre Channel Switch involves the following steps:
1. Mount the
2. Install the
transceivers, page 36
3. Configure the
4. Apply power to the
5. Connect the management station or workstation to the
6. Configure the
7. Cable devices to the

Mount the switch

The switch can be placed on a flat surface and stacked, or mounted in a 19" Electronics Industries
Association (EIA) rack. See
specifications. Adhesive rubber feet are provided for surface mounts only. Without the rubber feet, the
switch occupies 1U of space in an EIA rack.
The rack mount kit is supported with the following HP custom racks only:
HP 9000 Series Rack
HP 10000 Series Rack
HP 10000 G2 Series Rack

Before you begin

WARNING!
In single-rack installations, stabilizing feet are attached to the rack.
In multiple-rack installations, racks are coupled together.
Leveling jacks on the rack are extended to the floor.
The full weight of the rack rests on the leveling jacks.
Heavy items, such as uninterruptible power supplies and hard drive storage enclosures, are installed
near the bottom of the rack.
Similar components are installed next to each other in the rack. Because devices are of differing
depths, this will facilitate maintenance and service tasks.
switch, page 31
workstation, page 36
switch, page 37
switch, page 38
switch, page 39
"Weight and physical
To reduce the risk of personal injury or damage to the equipment, ensure that:
HP StorageWorks 8/20q Fibre Channel Switch Installation and Reference Guide
switch, page 38
dimensions" (page 71) for weight and dimensional
31

Advertisement

Table of Contents
loading

Table of Contents