Collect The Required Items; Verify The Kit Contents - HP StorageWorks 8/20q Installation And Reference Manual

Hp storageworks 8/20q fibre channel switch installation and reference guide (5697-0410, june 2010)
Hide thumbs Also See for StorageWorks 8/20q:
Table of Contents

Advertisement

Only one device in a rack is extended at a time. A rack may become unstable if more than one device
is extended.
CAUTION:
For proper airflow, the SFP+ media side (port side) of the device must face the front of the rack.
Mounting the switch in this direction allows air to enter from the front of the rack (SFP-port side of
switch) and exhaust through the back of the rack (power-supply side of switch). This prevents
overheating, which may cause equipment in the rack to fail.
Allow a minimum of 63.5 cm (25 in.) clearance in front of the rack to allow the doors to open fully, and
76.2 cm (30 in.) in back of the rack to allow for servicing and airflow.
If the device is mounted in a closed rack or there are multiple rack-mounted devices, make sure that the
operating temperature inside the rack enclosure does not exceed the maximum rated ambient
temperature.
Multiple rack-mounted devices connected to the same AC supply circuit may overload that circuit or the
AC supply wiring. Consider the power source capacity and the total power usage of all switches on the
circuit.
Reliable grounding in the rack must be maintained.

Collect the required items

NOTE:
The rack mount kit installation requires one technician.
Locate the following items and set them aside:
8/20q Fibre Channel Switch
8/20q and SN6000 Fibre Channel Switch rack-mount kit
Smaller items, such as screws, ship in plastic bags in the kit. See
Required tools:
#2 Phillips screwdriver
7/16-inch wrench

Verify the kit contents

Check the contents of the 8/20q and SN6000 Fibre Channel Switch rack mount kit shipping carton to
verify that all required parts and hardware are available
Table 9
8/20q and SN6000 Fibre Channel Switch rack mount kit hardware
Item
32
Description
Two (2) rear mounting brackets
Two (2) switch rails
One (1) filler panel (optional), see
Table
(Table
9).
step
7.
9.

Advertisement

Table of Contents
loading

Table of Contents