Download Print this page

Sharp XG-V10WLP Network Configuration Manual page 3

Operation manual

Advertisement

When installing the expansion cards you must do the following:
1.) Shut projector Off.
2.) Remove the three screws from expansion plate cover. (Refer to Figure A)
3.) Remove (4) four screws that secure the RF shield (Refer to Figure B)
NOTE: Number 2 - Only needs to be done if expansion slot is used for first time.
4.) Remove the cover plate from the optional expansion board that will be installed into the slot.
5.) Insert the expansion board into the connector (Refer to Figure C)
6.) Secure the expansion cover to the board.
Expansion Board Installation
Expansion Slot Closed (with cover)
FIG. A
Screws that secure Expansion Plate cover (Fig A).
3
10/16/2001
L:\tekcentr\CACTrain\SPS_ntwk

Advertisement

loading

This manual is also suitable for:

Xg-v10xuXg-v10xmXg-v10wuXg-v10wm