HP 409366-B21 - Voltaire DDR Switch Read This First Manual page 11

Voltaire infiniband interconnects - read this first documentation roadmap
Table of Contents

Advertisement

Title/Publication Date/Contents
Voltaire GridVision Integrated For Grid Directors User Documentation, Grid Director Software
Version: GridVision 5.4, ISR 9024 Grid Director Software Version: GridVision 5.1.1
(March 2009)
Topics covered include:
CLI basics
Initial system setup
Built-in test
Installing the GridVision Integrated Manager
Logging into the GridVision Integrated Device/Fabric Manager
Updating, backing up, and upgrading the software
Installing cables
Security settings
Safe mode
Failover/Handover mechanism and redundancy
Management Information Base (MIB) overview
GridVision Graphic Device Manager
Grid Director device and module information
Setting the GridVision VDM for switch management
Configuring I/O
VDM reset operations and security
Replacing modules
GridVision Integrated Fabric Manager overview
Fabric Manager- detailed description
Node name settings
Configuring the Subnet Manager
Bad ports configuration mode
Configuring routing algorithms
Partitioning and networks
Configuring quality of service (QoS)
Configuring nodes
Rack grouping
Large-scale operations
Remote connections
Fabric diagnostic overview
Configuring the fabric –Performance Monitor
Setting traps, events, and alarms
Bad ports
Health monitoring
Logs
Absent/Disconnected elements
Diagnostic utilities
Configuring the Cluster Monitor
Fabric diagnostics and suggestions
CLI reference guide
Port Counter fields
Supported traps and events
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents