Operator Preparation - Chamberlain LiftMaster Professional SW420 Installation And Maintenance Instructions Manual

Swing gate operator
Hide thumbs Also See for LiftMaster Professional SW420:
Table of Contents

Advertisement

10
Preparing the Installation

Operator Preparation

1
Open the service cover on the operator by removing 6 screws and pulling down and out.
Inside you will find the electrical enclosure stored vertically. All the electrical connections for
controls that the installer needs are provided here on the electrical box.
2
To service the solid state controller or other components of the electrical box, slide the
electrical box out, then pivot down.
3
Remove 1 screw securing the electrical box cover.
The S3 PCB is the major component of the electrical box and settings can be made by
changing the two dip switches. There is mixed voltage in this box, both line voltage, and
control voltage 24 VAC.
4
Select the preferred method of electrical wire entry. The SW420 is provided with (6) holes in
the bottom of the chassis for electrical entry. Power supply wiring will be routed to the large
double gang electrical box on the left side of the operator.
Doc 01-G0610
Rev A
CAUTION
Never remove cover of high voltage compartment unless power is off. Electric shock
and serious injury could result.
Controls and
Accessories
Line Connector
Cover
01-G0610F5
Wire Nut
Connections
Figure 4

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents