Chapter 2: Installation

Getting Started

Before installing your LCM, refer to the lists below to ensure you have all items
that shipped with the unit as well as other items necessary for proper installation.
Supplied with the LCM
LCM
Power cord
One package of four terminators
One CAT 5 cable, 1.8 meters (6 feet) in length
Rack mounting kit
LCM Installer and User Guide on CD
LCM Quick Installation Guide
One straight-through serial cable
Additional items needed
One KCO cable per attached PS/2 server or switch
One UCO cable per attached USB server or switch
One CCO cable per attached IBM C2T server

Installing Your LCM

Your LCM ships with rack mounting brackets. Before installing the LCM and
other components in the rack, stabilize the rack in a permanent location.
Install your equipment starting at the bottom of the rack, then work to the top.
Avoid uneven loading or overloading of racks.
Chapter 2: Installation
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

86495ax86857rx8685c1x1735l0486473ax86494ax ... Show all

Table of Contents