Chapter 2 Hardware Installation; Package Contents; Protecting Against Electrostatic Discharge - NETGEAR XSM7224S - ProSafe 10 Gigabit Stackable Hardware Installation Manual

Managed stackable switch
Hide thumbs Also See for XSM7224S - ProSafe 10 Gigabit Stackable:
Table of Contents

Advertisement

Hardware Installation
2.
This chapter explains how to install the hardware for the Managed Stackable Layer 2+ 10G
Switch XSM7224S.

Package Contents

Each switch is packed and shipped separately. The package contains the following items:
Managed Stackable Layer 2+ 10Gigabit Ethernet Switch with preinstalled software
Power cord
USB to serial converter
Rubber footpads for tabletop installation
Rubber caps for the SFP+ sockets
Rack-mounting kit
Null-modem serial cable (RS-232) with 9-pin connectors
Resource CD: The CD either includes these documents or links to access them:
-
ProSafe 7200 Managed Switch CLI Manual, Version 9.0
-
NETGEAR 7000 Series Managed Switch Administration Guide
-
NETGEAR Installation Guide for the XSM7224S Stackable Managed Switch
-
This Hardware Installation Guide
ProSafe NMS100 Network Management System 30-day trial CD-ROM

Protecting Against Electrostatic Discharge

WARNING!
Static electricity can harm delicate components inside your
system. To prevent static damage, discharge static electricity
from your body before you touch any of the electronic
components, such as the microprocessor. You can do so by
periodically touching an unpainted metal surface on the switch.
Chapter 2. Hardware Installation
2
| 9

Advertisement

Table of Contents
loading

Table of Contents