Novell LINUX ENTERPRISE SERVER 10 - INSTALLATION AND ADMINISTRATION 11-05-2007 Installation Manual page 543

Table of Contents

Advertisement

In this dialog, select the schemes to use for battery operation and AC operation. To add
or modify the schemes, click Edit Schemes, which opens an overview of the existing
schemes like that shown in
Figure 28.2, "Overview of Existing Schemes"
(page 525).
Figure 28.2 Overview of Existing Schemes
In the scheme overview, select the scheme to modify then click Edit. To create a new
scheme, click Add. The dialog that opens is the same in both cases and is shown in
Figure 28.3, "Configuring a Scheme"
(page 526).
Power Management
525

Advertisement

Table of Contents
loading

This manual is also suitable for:

Suse linux enterprise server 10

Table of Contents