Graphical Structure; Operations - CARLO GAVAZZI POWERSOFT Instruction Manual

Hide thumbs Also See for POWERSOFT:
Table of Contents

Advertisement

PowerSoft
5.8.2
G
In the top of the window the instrument and the period to be analysed can
be chosen. The button Load data allows uploading the relevant data from
the database to the software memory.
On the central area, the graph takes up the right side, while on the left there
are the commands and the options necessary for a reliable analysis. Two
sections are available: the Load profile section and the Optimisation one, where
the ideal contractual powers are suggested.
In the bottom, the buttons allow printing or exporting the analysis result
either in wmf (or bmp) format (if the Graph section is selected in the central
area) or in xls spreadsheet (if the Graph section is selected in the central
area).
5.8.3
O
The operations to be performed are suggested in the following paragraphs.
The first step is to generate the load profile graph of the selected
instrument.
5.8.3.1
The instrument and the period to be analysed are to be chosen in the top
area, pressing Load data. The Load profile section is to be selected. The load
profiles of that instrument in that period are shown day by day or week by
week according to the daily integration/weekly integration of the Display box.
The weekly integration is suggested to show the long-term consumptions
trend. The daily integration is suitable to analyse shorter periods (a few
weeks).
To analyse the trend of each day of the week separately (every Monday for
example), the daily integration view can be spitted with separate the days of the
week. Each day, or group of days, can be displayed selecting the proper
boxes in the excluded days list. In this way it is possible, for example, to
understand the differences in terms of consumptions within the week or if
PowerSoft – Instruction manual
RAPHICAL STRUCTURE
PERATIONS
L
OAD PROFILE EXTRAPOLATION
57