Download Print this page
Trane Tracer TD7 Installation Instructions Manual
Trane Tracer TD7 Installation Instructions Manual

Trane Tracer TD7 Installation Instructions Manual

Hide thumbs Also See for Tracer TD7:

Advertisement

Quick Links

Installation Instructions
Tracer® TD7 Display
For the:
• Tracer UC600 Programmable Controller
• Tracer UC800 Controller
• Symbio 500 Programmable Controller
• Symbio 800 Programmable Controller
Only qualified personnel should install and service the equipment. The installation,
starting up, and servicing of heating, ventilating, and air-conditioning equipment can
be hazardous and requires specific knowledge and training. Improperly installed,
adjusted or altered equipment by an unqualified person could result in death or
serious injury. When working on the equipment, observe all precautions in the
literature and on the tags, stickers, and labels that are attached to the equipment.
Seul le personnel qualifié doit installer et procéder à l'entretien des équipements.
L'installation, le démarrage et la réparation des équipements de chauffage, de
ventilation et de climatisation peuvent être dangereux et nécessitent une formation et
des connaissances spécifiques. Un équipement mal installé, réglé ou modifié par un
individu non qualifié peut entraîner des blessures graves, voire mortelles. Lors de toute
intervention sur l'équipement, respectez toutes les précautions figurant dans la
documentation et sur les étiquettes et autocollants fixés à l'équipement.
October 2022
SAFETY WARNING
AVERTISSEMENT DE SÉCURITÉ
BAS-SVN112H-EN
© 2022 Trane
X39641191-01

Advertisement

loading
Need help?

Need help?

Do you have a question about the Tracer TD7 and is the answer not in the manual?

Questions and answers

Summary of Contents for Trane Tracer TD7

  • Page 1 Un équipement mal installé, réglé ou modifié par un individu non qualifié peut entraîner des blessures graves, voire mortelles. Lors de toute intervention sur l'équipement, respectez toutes les précautions figurant dans la documentation et sur les étiquettes et autocollants fixés à l'équipement. October 2022 BAS-SVN112H-EN © 2022 Trane...
  • Page 2: Warnings, Cautions, And Notices

    Carbon (CFCs) and those containing Hydrogen, Chlorine, Fluorine and Carbon (HCFCs). Not all refrigerants containing these compounds have the same potential impact to the environment. Trane advocates the responsible handling of all refrigerants-including industry replacements for CFCs such as HCFCs and HFCs.
  • Page 3 WARNING Proper Field Wiring and Grounding Required! Failure to follow code could result in death or serious injury. All field wiring MUST be performed by qualified personnel. Improperly installed and grounded field wiring poses FIRE and ELECTROCUTION hazards. To avoid these hazards, you MUST follow requirements for field wiring installation and grounding as described in NEC and your local/state/national electrical codes.
  • Page 4 Copyright This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.
  • Page 5 Packaged Contents • One (1) Tracer TD7 display with permanently attached 3.3 ft (1 m.) power cable with male connector (PN: X13760335-01) • Four (4) M-4 screws • Four (4) spacer washers • Two (2) 2-pin terminal blocks (one spare) •...
  • Page 6 For steps 1 through 6, refer to Figure 1. Disconnect power at the circuit breaker and perform lockout/tagout procedures. 2. Open the enclosure door and disconnect the 24 VAC power from the controller. 3. Holding the display, insert the power cable (attached to the TD7) through the display opening on the front of the enclosure door.
  • Page 7 For steps 7 through 13, refer to Figure 2 Figure 7. Snip off the blue and gray wires from the power cable with female connector (PN: X19051625020) s o only the red and black wires remain. 8. Place one of the supplied terminal blocks onto an available 24 VAC terminal connection on the controller.
  • Page 8 Figure 3. Connecting to the controller IM C IM C + 24 + 24 + 24 XFMR MBUS LINK UI 1 UI 2 UI 3 UI 4 UI 5 UI 6 UI 7 UI 8 U C 600 LINK MBUS IM C B O 1 B O 2...
  • Page 9 M- 4 screws to tighten properly.) 5. Securely tighten the M-4 screws using a Phillips screwdriver. 6. Follow steps 7 through 13 of “Installing the TD7 Display in a Trane Large Enclosure”to complete this process. Figure 1. Example VESA mounting...
  • Page 10 Installing the TD7 onto a Chiller Panel for use with the UC800 Controller The following instructions require a sealed Ethernet cable for outdoor installation. See “Installing the TD7 Display in a Trane Large Enclosure” panel 3. 1. Disconnect power at the circuit breaker and perform lockout/tagout procedures.
  • Page 11 Figure 6. Installing the TD7 panel onto the chiller panel door...
  • Page 13 8. Connect one end of the chiller power supply cable to the TD7 global connector. 9. Connect the other end of the TD7 global connector to the chiller power supply Figure 7. Connecting the TD7 to the chiller power supply...
  • Page 14 10.Connect the other end of sealed Ethernet cable to the UC800 11.Connect the both ends of the power cables together. 12.Reconnect the 24VDC power to the power supply, remove lockout/tagout, and apply power to the circuit. Figure 8. Connecting the sealed Ethernet cable to the UC800...
  • Page 15 • Either Ethernet port on the Symbio 500 can be used. • Ethernet port #2 on the Symbio 800 should be used. Agency Listings and Compliance The European Union (EU) Declaration of Conformity is available from your ® local Trane office.
  • Page 16 For more information, please visit trane.com or tranetechnologies.com. Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.