Download Print this page

Dyness T10 Instruction Manual

Connection between tower and goodwe 5k-et

Advertisement

Quick Links

INSTRUCTION
for connection between
Tower and GOODWE 5K-ET
File version-20230425-V1-EN information might be subject to change without notice during product improving.
©Dyness reserves the copyright of this document.
1
V1.0

Advertisement

loading
Need help?

Need help?

Do you have a question about the T10 and is the answer not in the manual?

Questions and answers

Summary of Contents for Dyness T10

  • Page 1 INSTRUCTION for connection between Tower and GOODWE 5K-ET File version-20230425-V1-EN information might be subject to change without notice during product improving. ©Dyness reserves the copyright of this document. V1.0...
  • Page 2: Installation Steps

    3. There is a QR code label with WiFi serial number on the right side of the BDU. Applicable Product type Dyness Battery Module Type:  Tower T10 ESS unit/Tower T14 ESS unit/Tower T17 ESS unit GOODWE Inverter Type:  GW5K/8K/10K-ET...
  • Page 3 Connect the battery communication cable to inverter It is recommended to install a circuit breaker between Tower and GOODWE GOODWE 5K-ET DYNESS Tower DC BREAKER Tower and GOODWE connection diagram ©Dyness reserves the copyright of this document.
  • Page 4 Turn on battery: Turn on the circuit breaker on BDU of tower, turn on circuit breaker between Tower and GOODWE; turn on the power on switch and press and hold on the “wake” button for 10s Press and hold on 10secs ©Dyness reserves the copyright of this document.
  • Page 5 After the battery is turned on and the inverter is powered on, the mobile phone should first connect to the inverter's WIFI signal (password: 12345678), and then log in to the app "SolarGo" to select grid safety regulations, battery model, and working mode. The detailed operation steps are as follows: ©Dyness reserves the copyright of this document.
  • Page 6 After the battery model setting is completed, you can view the battery information in the parameter interface. After the communication between the battery and the inverter is normal, turn on the mains air switch, and you can check whether the grid information is normal in the setting interface. ©Dyness reserves the copyright of this document.
  • Page 7 In the “Quick Setting” of the app, select the working mode as the “Economic mode”.The battery is connected to the grid to charge and discharge. The detailed operation steps are as follows: ©Dyness reserves the copyright of this document.
  • Page 8 General Mode Settings: In the “Quick Setting” of the app, select the working mode as the “General mode”. The detailed operation steps are as follows: ©Dyness reserves the copyright of this document.
  • Page 9 ©Dyness reserves the copyright of this document.