Sign In
Upload
Download
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Dyness Manuals
Battery Pack
Tower T10
Instruction manual
Dyness T10 Instruction Manual
Connection between tower and goodwe 5k-et
Hide thumbs
Also See for T10
:
Quick start manual
,
User manual
(30 pages)
,
Quick installation manual
(8 pages)
1
2
3
4
5
6
7
8
9
page
of
9
Go
/
9
Bookmarks
Advertisement
Quick Links
Download this manual
INSTRUCTION
for connection between
Tower and GOODWE 5K-ET
File version-20230425-V1-EN information might be subject to change without notice during product improving.
©Dyness reserves the copyright of this document.
1
V1.0
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Need help?
Do you have a question about the T10 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Dyness T10
Battery Pack Dyness Tower T21 User Manual
(30 pages)
Inverter Dyness HV9637 User Manual
Tower ess (28 pages)
Battery Pack Dyness Tower Series Quick Installation Manual
Battery system (8 pages)
Battery Pack Dyness Tower T Series Quick Installation Manual
(8 pages)
Dyness Tower Series, T7, T10, T14, T17, T21 Installation Guide
(article)
Battery Pack Dyness Tower ESS User Manual
(28 pages)
Battery Pack Dyness TowerESS User Manual
(30 pages)
Battery Pack Dyness T9637 User Manual
(30 pages)
Battery Pack Dyness Tower-US User Manual
Hv battery system (30 pages)
Battery Pack Dyness KOSTAL PLENTICORE plus/BI Instructions Manual
(8 pages)
Battery Pack Dyness B48100 User Manual
Ess unit (23 pages)
Battery Pack Dyness A48100 User Manual
(26 pages)
Battery Pack Dyness POWERCUBE Series User Manual
(30 pages)
Battery Pack Dyness B3 User Manual
Ess unit (26 pages)
Battery Pack Dyness PowerRack HV4 User Manual
(27 pages)
Battery Pack Dyness PowerDepot H5B User Manual
(33 pages)
Summary of Contents for Dyness T10
Page 1
INSTRUCTION for connection between Tower and GOODWE 5K-ET File version-20230425-V1-EN information might be subject to change without notice during product improving. ©Dyness reserves the copyright of this document. V1.0...
Page 2: Installation Steps
3. There is a QR code label with WiFi serial number on the right side of the BDU. Applicable Product type Dyness Battery Module Type: Tower T10 ESS unit/Tower T14 ESS unit/Tower T17 ESS unit GOODWE Inverter Type: GW5K/8K/10K-ET...
Page 3
Connect the battery communication cable to inverter It is recommended to install a circuit breaker between Tower and GOODWE GOODWE 5K-ET DYNESS Tower DC BREAKER Tower and GOODWE connection diagram ©Dyness reserves the copyright of this document.
Page 4
Turn on battery: Turn on the circuit breaker on BDU of tower, turn on circuit breaker between Tower and GOODWE; turn on the power on switch and press and hold on the “wake” button for 10s Press and hold on 10secs ©Dyness reserves the copyright of this document.
Page 5
After the battery is turned on and the inverter is powered on, the mobile phone should first connect to the inverter's WIFI signal (password: 12345678), and then log in to the app "SolarGo" to select grid safety regulations, battery model, and working mode. The detailed operation steps are as follows: ©Dyness reserves the copyright of this document.
Page 6
After the battery model setting is completed, you can view the battery information in the parameter interface. After the communication between the battery and the inverter is normal, turn on the mains air switch, and you can check whether the grid information is normal in the setting interface. ©Dyness reserves the copyright of this document.
Page 7
In the “Quick Setting” of the app, select the working mode as the “Economic mode”.The battery is connected to the grid to charge and discharge. The detailed operation steps are as follows: ©Dyness reserves the copyright of this document.
Page 8
General Mode Settings: In the “Quick Setting” of the app, select the working mode as the “General mode”. The detailed operation steps are as follows: ©Dyness reserves the copyright of this document.
Page 9
©Dyness reserves the copyright of this document.
This manual is also suitable for:
T14
T17
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the T10 and is the answer not in the manual?
Questions and answers