www.ti.com
EVM User's Guide: TRF-LSC-AFE7950EVM
TRF-LSC-AFE7950 Evaluation Module
Description
The TRF-LSC-AFE7950EVM evaluation module is
used to evaluate the performance of TI's
family of integrated RF sampling transceivers with TI's
TRF1208
single-ended-to-differential amplifier on RX,
and
TRF1108
differential-to-single-ended amplifier
on TX. The AFE79xx devices support up to four
transmit, four receive, and two feedback channels
(4T4R2F) and integrates a phase-locked loop (PLL)
and voltage-controlled oscillator (VCO) for generating
data-converter clocks. The AFE79xx integrates eight
JESD204B- and JESD204C-compatible serializer
or deserializer (SerDes) transceivers. These
transceivers are capable of running up to 29.5Gbps to
transmit and receive digital data through the onboard
FPGA mezzanine card (FMC) connector.
The EVM includes the
LMK04828
to provide reference clocks and SYSREF to the
analog front end (AFE) and capture card (field-
programmable gate array, FPGA). The evaluation
module (EVM) uses a single 5.5V input and includes
complete power-management circuitry. External
clocking options include support for feeding the
reference clock (for the on-chip PLL). The design
SLAU957 – JUNE 2025
Submit Document Feedback
interfaces with the TI pattern and capture card
solution (TSW14J56EVM or TSW14J57EVM), as well
as many FPGA development kits.
AFE79xx
Get Started
1. Order the TRF-LSC-AFE7950EVM
2. Order
3. Download the latest software and libraries.
4. Download the comprehensive reference design
5. For latest info please refer to
Features
•
•
clock generator
•
Applications
•
•
•
•
•
TRF-LSC-AFE7950EVM Board
Copyright © 2025 Texas Instruments Incorporated
TSW14J56EVM
OR
files.
DESIGN
folder.
Operates on single 5.5V supply
Includes onboard clock generation
RF front end with > 8GHz S2D and D2S amplifiers
Seeker front end
Radar
Defense radio
Tactical communications infrastructure
Wireless communications test
TRF-LSC-AFE7950 Evaluation Module
Description
TSW14J57EVM
AFE79XX-HSC-
1
Need help?
Do you have a question about the TRF-LSC-AFE7950EVM and is the answer not in the manual?
Questions and answers