Hitachi ABB REC650 Commissioning Manual
Hitachi ABB REC650 Commissioning Manual

Hitachi ABB REC650 Commissioning Manual

Bay control
Table of Contents

Advertisement

Quick Links

®
Relion
650 SERIES
Bay control REC650
Version 2.2 IEC
Commissioning manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ABB REC650 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Section 1 Introduction
1.1 This manual
Explains the purpose, scope, and intended audience of the commissioning manual.
1.2 Intended audience
Describes the personnel responsible for commissioning and maintenance, and their required knowledge.
1.3 Product documentation
Lists and describes the various manuals available for the IED product family.
1.4 Document symbols and conventions
Explains the meaning of symbols, icons, and conventions used throughout the manual.
Section 2 Safety information
2.1 Symbols on the product
Illustrates and explains the safety symbols found on the product itself.
2.2 Warnings
Provides crucial warnings regarding electrical hazards, installation, and operation.
2.3 Caution signs
Lists caution signs related to electrostatic discharge (ESD) and handling.
Section 3 Available functions
3.1 Back-up protection functions
Lists available back-up protection functions with IEC 61850 names and ANSI codes.
3.2 Control and monitoring functions
Lists control and monitoring functions with descriptions and IED bay control codes.
3.3 Communication
Details station communication protocols and functions supported by the IED.
3.4 Basic IED functions
Lists and describes the fundamental functions of the IED.
Section 4 Starting up
4.1 Factory and site acceptance testing
Explains different types of IED testing including FAT and SAT.
4.2 Commissioning checklist
Lists essential items to check before commencing site commissioning.
4.3 Checking the power supply
Details procedures for checking the IED's power supply connections and voltage.
4.4 Energizing the IED
Covers the process of energizing the IED and initial operational checks.
4.5 Setting up communication between PCM600 and the IED
Explains how to establish communication between PCM600 and the IED.
Section 5 Configuring the IED and changing settings
5.1 Overview
Provides an overview of IED configuration and parameter setting procedures.
5.2 Configuring analog CT inputs
Details the process of configuring analog CT inputs for accurate measurements.
5.3 Supervision of input/output modules
Explains the supervision of I/O modules and error detection mechanisms.
Section 6 Establishing connection and verifying the SPA/IEC communication
6.1 Entering settings
Describes how to enter SPA or IEC communication settings on the IED.
6.2 Verifying the communication
Explains different methods to verify SPA and IEC communication.
6.4 Optical budget calculation for serial communication with SPA/IEC
Explains how to calculate optical budgets for serial communication.
Section 7 Establishing connection and verifying the LON communication
7.1 Communication via the rear ports
Covers communication setup and configuration via the rear ports.
7.1.1 LON communication
Details the process of establishing and configuring LON communication.
Section 8 Testing IED operation
8.1 Preparing for test
Lists requirements and preparatory steps before performing IED tests.
8.2 Activating the test mode
Describes how to activate the IED's test mode for functional testing.
8.3 Preparing the connection to the test equipment
Explains how to connect test equipment using test switches.
8.6 Verifying analog primary and secondary measurement
Covers verification of analog measurements and scaling of signals.
8.8 Forcing of binary input/output signals for testing
Explains how to force binary input/output signals for testing purposes.
Section 9 Testing functionality by secondary injection
9.3 Current protection
Covers testing procedures for various current protection functions.
9.5 Secondary system supervision
Covers testing procedures for secondary system supervision functions.
9.6 Control
Covers testing procedures for control functions.
9.7 Logic
Details testing procedures for logic functions.
9.8 Monitoring
Covers testing procedures for monitoring functions.
Section 10 Commissioning and maintenance of the fault clearing system
10.1 Commissioning tests
Outlines the verification steps required during the commissioning process.
10.2 Periodic maintenance tests
Discusses periodic maintenance procedures and test intervals for IEDs.
10.2.2 Maintenance tests
Covers general maintenance test procedures including preparation and recording.
10.2.2.6 Trip circuit check
Explains the procedure for performing a trip circuit check.
Section 11 Troubleshooting
11.1 Checking the self supervision signals
Guides on checking IED self-supervision signals and diagnosing failures.
11.2 Fault tracing
Provides methods for tracing faults using internal indications and PC tools.
11.2.3 Diagnosing the IED status via the LHMI hint menu
Describes using LHMI hints for diagnosing IED status and troubleshooting.
11.3 Repair instruction
Provides essential instructions for repairing IEDs and handling components safely.

Table of Contents