Hitachi ABB REC650 Manuals
Manuals and User Guides for Hitachi ABB REC650. We have
1
Hitachi ABB REC650 manual available for free PDF download: Commissioning Manual
Hitachi ABB REC650 Commissioning Manual (126 pages)
Bay control
Brand:
Hitachi
| Category:
Control Unit
| Size: 2 MB
Table of Contents
Warranty
4
Table of Contents
7
Introduction
13
This Manual
13
Intended Audience
13
Product Documentation
14
Product Documentation Set
14
Document Revision History
15
Related Documents
15
Document Symbols and Conventions
16
Symbols
16
Document Conventions
17
IEC 61850 Edition 1 / Edition 2 Mapping
17
Safety Information
21
Symbols on the Product
21
Warnings
21
Caution Signs
22
Note Signs
23
Available Functions
25
Back-Up Protection Functions
25
Control and Monitoring Functions
25
Communication
29
Basic IED Functions
31
Starting up
33
Factory and Site Acceptance Testing
33
Commissioning Checklist
33
Checking the Power Supply
33
Energizing the IED
34
Checking the IED Operation
34
IED Start-Up Sequence
34
Setting up Communication between PCM600 and the IED
35
When IED Has Blank Front Panel
35
When IED Has Front Port with RJ-45
35
Setting up IP Addresses
35
Writing an Application Configuration to the IED
39
Checking CT Circuits
39
Checking VT Circuits
40
Using the RTXP Test Switch
40
Checking the Binary Input/Output Circuits
41
Binary Input Circuits
41
Binary Output Circuits
41
Checking Optical Connections
41
Configuring the IED and Changing Settings
43
Overview
43
Configuring Analog CT Inputs
43
Supervision of Input/Output Modules
44
Establishing Connection and Verifying the SPA/IEC Communication
45
Entering Settings
45
Entering SPA Settings
45
Entering IEC Settings
45
Verifying the Communication
45
Verifying SPA Communication
46
Verifying IEC Communication
46
Fiber Optic Loop
46
Optical Budget Calculation for Serial Communication with SPA/IEC
47
Establishing Connection and Verifying the LON Communication
49
Communication Via the Rear Ports
49
LON Communication
49
The LON Protocol
50
Hardware and Software Modules
50
Optical Budget Calculation for Serial Communication with LON
51
Testing IED Operation
53
Preparing for Test
53
Requirements
53
Preparing the IED to Verify Settings
54
Activating the Test Mode
55
Preparing the Connection to the Test Equipment
55
Connecting the Test Equipment to the IED
56
Releasing the Function to be Tested
56
Verifying Analog Primary and Secondary Measurement
57
Testing the Protection Functionality
57
Forcing of Binary Input/Output Signals for Testing
58
Forcing Concept
58
How to Enable Forcing
58
Enable Forcing by Using LHMI
58
Enable Forcing Using TESTMODE Function Block
58
How to Change Binary Input/Output Signals Using Forcing
59
Forcing by Using LHMI
59
Forcing by Using PCM600
60
How to Undo Forcing Changes and Return the IED to Normal Operation
62
Undo Forcing by Using TESTMODE Component
62
Undo Forcing by Using LHMI
62
Undo Forcing by Using PCM600
62
Testing Functionality by Secondary Injection
63
Testing Disturbance Report
63
Introduction
63
Disturbance Report Settings
63
Disturbance Recorder (DR)
63
Event Recorder (ER) and Event List (EL)
64
Identifying the Function to Test in the Technical Reference Manual
64
Current Protection
64
Instantaneous Phase Overcurrent Protection 3-Phase Output PHPIOC
64
Measuring the Operate Limit of Set Values
65
Completing the Test
65
Directional Phase Overcurrent Protection, Four Steps OC4PTOC
65
Function Revision History
65
Verifying the Settings
66
Completing the Test
67
Four Step Residual Overcurrent Protection, (Zero Sequence or Negative Sequence Directionality) EF4PTOC
67
Function Revision History
67
Four Step Directional Earth Fault Protection
67
Four Step Non-Directional Earth Fault Protection
67
Completing the Test
68
Breaker Failure Protection, Phase Segregated Activation and Output CCRBRF
68
Function Revision History
68
Checking the Phase Current Operate Value, IP
68
Checking the Residual (Earth Fault) Current Operate Value IN> Set below IP
68
Checking the Re-Trip and Back-Up Times
69
Verifying the Re-Trip Mode
69
Verifying the Back-Up Trip Mode
69
Verifying Instantaneous Back-Up Trip at CB Faulty Condition
70
Verifying the Case Retripmode = Contact
70
Verifying the Function Mode Current/Contact
71
Completing the Test
71
Overcurrent Protection with Binary Release BRPTOC
71
Measuring the Operate Limit of Set Values
71
Completing the Test
72
Pole Discordance Protection CCPDSC
72
Verifying the Settings
72
Completing the Test
73
Multipurpose Protection
73
Function Revision History
73
General Current and Voltage Protection CVGAPC
73
Built-In Overcurrent Feature (Non-Directional)
74
Overcurrent Feature with Current Restraint
74
Overcurrent Feature with Voltage Restraint
74
Overcurrent Feature with Directionality
75
Over/Undervoltage Feature
75
Completing the Test
75
Secondary System Supervision
76
Current Circuit Supervision CCSSPVC
76
Verifying the Settings
76
Completing the Test
76
Fuse Failure Supervision FUFSPVC
76
Checking that the Binary Inputs and Outputs Operate as Expected
76
Measuring the Operate Value for the Negative Sequence Function
77
Measuring the Operate Value for the Zero-Sequence Function
78
Measuring the Operate Value for the Dead Line Detection Function
78
Checking the Operation of the Du/Dt and DI/Dt Based Function
79
Completing the Test
79
Control
79
Synchrocheck, Energizing Check, and Synchronizing SESRSYN
79
Testing the Synchronizing Function
80
Testing the Synchrocheck Functionality
81
Testing the Energizing Check
83
Testing the Voltage Selection
84
Completing the Test
84
Autorecloser for 1/2/3-Phase Operation SMBRREC
84
Preparation of the Verification
86
Switching the Auto Recloser to on and off on and off
86
Verifying the Auto Recloser
87
Checking the Auto Reclosing Conditions
87
Completing the Test
88
Apparatus Control APC
89
Single Command, 16 Signals SINGLECMD
89
Interlocking
89
Logic
89
Tripping Logic, Common 3-Phase Output SMPPTRC
89
Function Revision History
90
Phase Operating Mode
90
1Ph/3Ph Operating Mode
90
1Ph/2Ph/3Ph Operating Mode
91
Circuit Breaker Lockout
92
Completing the Test
92
Monitoring
92
Gas Medium Supervision SSIMG
92
Function Revision History
93
Testing the Gas Medium Supervision for Pressure Alarm and Pressure Lockout Conditions
93
Testing the Gas Medium Supervision for Temperature Alarm and Temperature
93
Lockout Conditions
93
Completing the Test
93
Liquid Medium Supervision SSIML
94
Function Revision History
94
Testing the Liquid Medium Supervision for Level Alarm and Level Lockout Conditions
94
Testing the Gas Medium Supervision for Temperature Alarm and Temperature Lockout Conditions
94
Completing the Test
95
Breaker Monitoring SSCBR
95
Verifying the Settings
95
Completing the Test
96
Event Function EVENT
96
Limit Counter L4UFCNT
97
Completing the Test
97
Function Revision History
97
Voltage Harmonic Monitoring VHMMHAI
97
Verifying the Signals and Settings
97
Completing the Test
98
Function Revision History
98
Fault Current and Voltage Monitoring Function FLTMMXU
98
Verifying the Settings
98
Fault Locator LMBRFLO
98
Function Revision History
99
Verifying the Signals and Settings
99
Measuring the Operate Limit
99
Completing the Test
100
Metering
100
Pulse-Counter Logic PCFCNT
100
Function for Energy Calculation and Demand Handling ETPMMTR
100
Verifying the Settings
100
Completing the Test
101
Station Communication
102
Multiple Command and Transmit MULTICMDRCV / MULTICMDSND
102
Basic IED Functions
102
Parameter Setting Group Handling SETGRPS
102
Verifying the Settings
102
Completing the Test
102
Exit Test Mode
102
Commissioning and Maintenance of the Fault Clearing System
105
Commissioning Tests
105
Periodic Maintenance Tests
105
Visual Inspection
106
Maintenance Tests
106
Preparation
106
Recording
106
Secondary Injection
106
Alarm Test
106
Self Supervision Check
107
Trip Circuit Check
107
Measurement of Service Currents
107
Restoring
108
Troubleshooting
109
Checking the Self Supervision Signals
109
Checking the Self Supervision Function
109
Determine the Cause of an Internal Failure
109
Self Supervision HMI Data
109
General IED Status
109
Fault Tracing
110
Internal Fault Indications
110
Using Front-Connected PC
111
Diagnosing the IED Status Via the LHMI Hint Menu
112
Hardware Re-Configuration
114
Repair Instruction
115
Repair Support
116
Maintenance
116
Glossary
117
Advertisement
Advertisement
Related Products
Hitachi ABB Relion 650 Series
Hitachi ABB RET650
Hitachi AXF300E
Hitachi AXF300UC
Hitachi AX-M20EBS
Hitachi AVC50
Hitachi AJH-CE series
Hitachi AMS 2500
Hitachi ATW-MBS-02
Hitachi ATW-YMM-02
Hitachi Categories
Air Conditioner
Projector
Drill
Refrigerator
TV
More Hitachi Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL