Advertisement

Quick Links

REV.
Description
REV.
首次发行
00
某某某
2022/XX/XX
1. 修改封底封面,色号 , contact info 页信息
2. 修改附件包表述方式
1.0
陈珍珍
2024/1/18
2.2.2 增加无需外部接线
4.1 改为室内外安装
5.2 增加一分二线束包
6.2 增加公母端子通电说明
6.2.1 增加防尘罩注意事项
9.3 改为 storing,增加维修报错
2.0
contact info 删去土耳其电话,变更澳洲邮箱
修改封底
李杭钊
2024/8/28
描述
说明书 XX series 英文版 SolaX
浙江艾罗网络能源技术股份有限公司
料号
SolaX Power Network Technology
320101XXXX00
(Zhejiang) Co., Ltd.
单位
页次
mm
Description
技术要求:
1. 封面封底 157g 铜版纸覆哑膜彩打,内部纸 80g 双胶纸黑白印刷,正反打印;
2. 装订方式:胶装或骑马钉,内页大于 60 页时须胶装;
3. 未注尺寸公差按 ±3 mm;
4. 图面、字体印刷清晰、无偏移、无毛边、不起边、油墨不脱落;
5. 黑色字体颜色为 PANTONE BLACK C, 无边框,底色为白色;
6. 符合 ROHS 要求。
143 mm
T-BAT-SYS-HV-S50E
Installation Manual
Version **
eManual in the QR code or at
http://kb.solaxpower.com/
www.solaxpower.com
描述
说明书 XX series 英文版 SolaX
材料
双胶纸
料号
320101XXXX00
单位
页次
mm
设计
某某某 2022/XX/XX
审核
某某某 2022/XX/XX
核准
施鑫淼 2022/XX/XX
浙江艾罗网络能源技术股份有限公司

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TP-HS50E and is the answer not in the manual?

Questions and answers

Summarization of Contents

STATEMENT
Copyright
Copyright notice for the manual content and its usage.
Trademarks
Information regarding SolaX's registered trademarks and logos.
Notice
General disclaimer and important notices about the manual's content.
About This Manual
Scope of Validity
Defines the scope and applicability of this manual for the T-BAT Series.
Target Tower
Specifies requirements for qualified personnel for installation and maintenance.
Conventions
Change History
Records significant changes made to the manual over its revisions.
1 Safety
1.1 General Safety
Provides essential safety precautions for handling and installing the rechargeable battery.
1.2 General Safety Precautions
Details specific safety measures to prevent hazards during operation and installation.
1.3 Battery Handling Guide
Offers guidelines on proper handling, storage, and installation practices for battery modules.
1.4 Response to Emergency Situations
Outlines procedures for responding to battery leaks, fires, and other critical emergencies.
2 Product Overview
2.1 System Description
Explains the components and overall function of the T-BAT system.
2.2 Appearance
Describes the physical appearance and layout of the system components.
2.2.1 Weight and Dimensions
Lists the physical dimensions and weights of the BMS, battery module, Base, and Series Box.
2.2.2 BMS (TBMS-MCS0800E)
Details the Battery Management System (BMS) and its various ports and functions.
DIP Switch
Explains the function and configuration settings for the DIP switch on the BMS.
2.2.3 Battery module (TP-HS50E)
Describes the battery module, its model, and its connection interface.
2.2.4 Base
Details the Base component and its connection interface for system assembly.
2.2.5 Series Box
Explains the function and ports of the Series Box for multi-tower configurations.
2.2.6 Indicators
Describes the status and SOC power indicators on the BMS and their meanings.
Black Start
Explains the Black Start functionality and its specific startup procedure.
2.2.7 Symbols on the Label
Lists and explains the meaning of various safety and certification symbols found on the product labels.
2.3 Features
Highlights the key technical features and characteristics of the T-BAT SYS-HV energy storage system.
2.4 Certifications
Lists the safety and regulatory certifications obtained by the battery system.
3 Transportation and Storage
Transportation
Provides essential guidelines for safely transporting the rechargeable battery module.
Storage
Details the requirements for proper storage of the battery to maintain its quality and lifespan.
4 Preparation before Installation
4.1 Selection of Installation Location
Guides on choosing a suitable and safe location for installing the battery system.
4.1.1 Environment Requirement
Specifies the required ambient temperature, humidity, and altitude for installation.
4.1.2 Installation Carrier Requirement
Details requirements for the mounting surface, bearing capacity, and wall thickness.
4.1.3 Clearance Requirement
Outlines necessary clearances around the battery for heat dissipation, access, and expansion.
4.2 Tools Requirement
Lists the recommended tools required for performing the installation.
4.3 Additionally Required Materials
Lists any additional materials, such as cables or pipes, needed for installation.
5 Unpacking and Inspection
5.1 Unpacking
Provides instructions on how to safely unpack the BMS, battery modules, and accessories.
5.2 Scope of Delivery
Lists all items and quantities included in the product package for verification.
6 Mechanical Installation
6.1 Installation Options
Presents various configuration options for installing the system based on number of towers.
6.2 Installation Procedure
Details the step-by-step process for mechanically installing the battery system.
6.2.1 Floor Mounting
Provides specific instructions for installing the system on the floor.
One Tower for Floor Mounting
Specific installation steps for a one-tower configuration on the floor.
Two Tower for Floor Mounting
Specific installation steps for a two-tower configuration on the floor.
6.2.2 Wall Mounting
Provides specific instructions for installing the system on a wall.
One Tower for Wall Mounting
Specific installation steps for a one-tower configuration on a wall.
Two Towers for Wall Mounting
Specific installation steps for a two-tower configuration on a wall.
6.3 Battery Capacity Expansion
Explains the process and considerations for expanding the battery system's capacity.
7 Wiring
7.1 Details of Cables
Describes the different types of cables used for system connectivity and their functions.
7.2 Wiring Procedure
Step-by-step guide for correctly connecting the BMS, Series Box, and other components.
7.3 Installation of Cover
Instructions for installing the protective cover after completing the system wiring.
8 System Commissioning
8.1 Checking before Power-on
Outlines pre-checks to ensure correct installation before powering on the system.
8.2 Powering on the System
Details the procedures for safely activating and powering on the installed battery system.
9 Troubleshooting and Maintenance
9.1 Power off the System
Provides instructions for safely shutting down the battery system.
9.2 Troubleshooting
Information and solutions for identifying and resolving common system errors and faults.
9.3 Maintenance
Guidelines for performing routine maintenance to ensure optimal system performance and longevity.
10 Decommissioning
10.1 Disassembling the Battery
Step-by-step instructions for safely disconnecting and removing the battery modules.
10.2 Packing
Instructions for properly packing the battery modules for storage or return.
10.3 Disposing of the Rechargeable Battery
Guidance on the environmentally responsible disposal of the battery according to regulations.
11 Technical Data
Configuration List
Lists the available system configurations, including model, BMS, and battery module details.
Performance Parameter
Details the technical specifications and performance metrics of the battery system.

Table of Contents