Download Print this page
DECKED DS2 Installation Instructions Manual

DECKED DS2 Installation Instructions Manual

For ford super duty 6'9” bed length 1999-2016

Advertisement

Quick Links

FORD SUPER DUTY
REGISTER YOUR SYSTEM
Watch short installation videos at www.decked.com/video | Register your system at www.decked.com/warranty
FOLLOW US:
Installation Instructions:
DS1/DS2
6'9" BED LENGTH
1999-2016
TOOLS REQUIRED
• 3/8" socket
• 7/16" socket
• Wire cutters
• 1/8" hex wrench
DECKED.COM | 208.806.0251
• 7/32" hex wrench
• 1/2" drill bit
• 10 mm socket or
open end wrench
@DECKEDUSA | #DECKEDUSA
VERSION 8
INSTRUCTION VIDEOS
RC417

Advertisement

loading
Need help?

Need help?

Do you have a question about the DS2 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Important Pre-Installation Warnings
Torque Boy Warnings
Crucial advice on proper tightening and power tool usage during installation.
Ammo Can Drain Hole Guidance
Instructions on whether and how to drill holes in ammo cans for drainage.
Bed Preparation Steps
Prepare Truck Bed Tie-downs
Instructions for removing factory tie-downs and installing DECKED brackets.
Drawer Component Assembly
Install Drawer Brackets and Wheels
Steps for attaching brackets and wheels to the drawer components.
Drawer Installation
Install Drawers and Weather Strips
Guide for sliding drawers into channels and applying weather stripping.
J-Hook Installation and Tightening
Install J-Hooks
Procedure for inserting and loosely fastening J-hooks into ammo cans.
Tighten J-Hooks
Final steps for securely tightening J-hooks and adding protective elements.