Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Instron Manuals
Test Equipment
5969
Manual
Instron 5969 Manual
Dual column table frames
Hide thumbs
1
2
3
4
5
6
Table Of Contents
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
page
of
84
Go
/
84
Contents
Table of Contents
Troubleshooting
Bookmarks
Table of Contents
Table of Contents
Chapter 1 Introduction
System Description and Terminology
Components
Principle of Operation
Hardware Controls
Software
System Components and Interconnections
System Safety and Information Labeling
Product Support
Product Documentation
Chapter 2 Requirements and Specifications
Responsibilities
Customer's Responsibilities
Instron's Responsibilities
Responsibilities
Site Requirements
Frame Location
Floor Loading
Power Supply
Telephone and Network Access
Ceiling Clearance
Environmental Conditions
Accessibility
Site Requirements for System Accessories
Environmental Specifications
General
Conformity with EU Directives
Environmental Impact
Noise Levels
Power Cord Selections
Power Requirements
Series 5960 Optional Configurations
Series 5960 Dimensions
Standard Frame Dimensions
Extra Height Configuration
Extra Wide Configuration
Extra Wide and Extra Height Configuration
Second Test Space Configuration
Extra Height with Second Test Space Configuration
Load Frame Weights
Accessory Mounting Dimensions
Base Beam
Crosshead
Top Plate
Checklist for Site Preparation
Site Location
Transporting
Scheduling Installation
Chapter 3 Lifting and Handling
General Handling Precautions
Packaging Dimensions
Unpacking Dual Column Frames
Transporting Dual Column Frames
Before You Begin
Equipment
Transporting Procedures
Chapter 4 Installation
Level the Load Frame
Equipment
Procedure
Set the Input Voltage
Power Supply Compatibility
Connect the System Components
Connect Optional Accessories
First Time Startup
Chapter 5 Maintenance
Preventive Maintenance
Daily Maintenance Checks
Periodic Inspections
Cleaning
Lubrication
General Maintenance Procedures
Test Limit Stops
Replace a Fuse
Troubleshooting for Load Cells
Ancillary Parts
Models 5965 and 5966
Models 5967 and 5969
Advertisement
Quick Links
1
Introduction
2
System Description and Terminology
3
Components
4
Principle of Operation
5
Requirements and Specifications
Download this manual
5960 Series Dual Column Table Frames
System Support
M10-16248-EN Revision E
The difference is measurable
®
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the 5969 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Instron 5969
Test Equipment Instron 5940 Operator's Manual
5940 series single column table frames (58 pages)
Test Equipment Instron 5960 Series Manual
Dual column table frames (84 pages)
Test Equipment Instron 5965 Manual
Dual column table frames (84 pages)
Test Equipment Instron 5966 Manual
Dual column table frames (84 pages)
Test Equipment Instron 5967 Manual
Dual column table frames (84 pages)
Test Equipment Instron CEAST 9340 Instructions For Use And Maintenance Manual
Drop weight impact testing system (179 pages)
Test Equipment Instron 4400 Series Operator's Manual
Universal testing system (271 pages)
Test Equipment Instron 34TM-50 Preinstallation Manual
Dual column table model (64 pages)
Test Equipment Instron 3119-600 Series Reference Manual - Pre-Installation
Temperature controlled chambers (36 pages)
Test Equipment Instron DX Series Operating Instructions Manual
Static hydraulic universal testing system (96 pages)
Test Equipment Instron LX Series Manual
Static hydraulic universal testing system (54 pages)
Test Equipment Instron 3400 Series Operator's Manual
Single column table (126 pages)
Test Equipment Instron KPX Operating Instructions Manual
Static hydraulic universal testing system (70 pages)
Test Equipment Instron MicroTorsion MT1 Operating Instructions Manual
Testing system (54 pages)
Test Equipment Instron 2710-11 Series Reference Manual
Screw action grips (42 pages)
Test Equipment Instron MT1 Preinstallation Manual
Microtorsion testing system (42 pages)
Summarization of Contents
Introduction
System Overview and Operation
Covers system description, terminology, principle of operation, and system connections.
System Safety and Information Labeling
Explains safety labels and their meanings on the testing system.
Product Support and Documentation
Information on obtaining help, manuals, and other documentation for the system.
Requirements and Specifications
Responsibilities
Outlines customer and Instron responsibilities for system setup and operation.
Site Requirements
Specifies environmental, power, and physical prerequisites for system installation.
Environmental Specifications
Details operating and storage temperature, humidity, and EU directives compliance.
Power Requirements and Cord Selections
Covers voltage, frequency, power cord types, and receptacle compatibility.
Series 5960 Configurations, Dimensions, and Weights
Lists optional frame configurations, dimensions, and weights for 5960 series.
Accessory Mounting Dimensions
Details mounting hole locations and dimensions for accessories on base beam and crosshead.
Checklist for Site Preparation
A summary of tasks for planning and preparing the testing system site location.
Lifting, Handling, and Transporting
General Handling Precautions
Guidelines for experienced personnel operating lifting equipment for Instron systems.
Lifting Warnings
Critical safety warnings related to lifting the load frame.
Packaging and Unpacking Procedures
Information on frame packaging dimensions and unpacking instructions.
Transporting Procedures
Details methods for transporting the load frame using base, crosshead, or crane.
Installation
Leveling the Load Frame
Steps to ensure the load frame is level for accurate testing.
Setting the Input Voltage
Procedure to verify and set the system's voltage to match the power supply.
Connecting System Components and Accessories
Describes connections for basic system components and optional accessories.
First Time Startup and Configuration
Steps for initial system configuration and software setup after installation.
Maintenance
Preventive Maintenance Overview
Guidelines for periodic inspection, cleaning, and lubrication of the test system.
Daily and Periodic Checks
Daily checks and periodic inspections for system readiness and health.
Cleaning and Lubrication
Recommended procedures for cleaning and lubricating system components.
General Maintenance Procedures
Procedures that can be performed without a service technician.
Troubleshooting and Parts Information
Guidance on load cell issues and lists of included ancillary parts.
Table of Contents
Save PDF
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the 5969 and is the answer not in the manual?
Questions and answers