Davey BT20-40 Installation And Operating Instructions Manual

Davey BT20-40 Installation And Operating Instructions Manual

Torrium2

Advertisement

Installation and
Operating Instructions
for Davey BT Series
Pressure Systems with
NOTE: Prior to installation remove the inlet and outlet
pipe transport plugs & associated seals from the
suction and/or discharge ports.
WARNING : The Torrium2 controller, pump and associated pipework operate
under pressure. Under no circumstances should the Torrium2 controller,
pump or associated pipework be disassembled unless the internal pressure
of the unit has been relieved. Failure to observe this warning will expose
persons to the possibility of personal injury and may also result in damage
to the pump, pipework or other property.
WARNING: Failure to follow these instructions and comply with all applicable
codes may cause serious bodily injury and/or property damage.
Please pass these instructions on to the operator of this equipment.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BT20-40 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Fitting the Torrium2 Directly to the Pump
Fitting the Torrium2 Directly to the Pump
Attaching the Torrium2 controller to the pump using its rotary coupling and ensuring a secure connection.
Installation Connections and Site
Discharge Connections
Options for connecting pipework to the discharge port or vertical priming port.
Choosing a Site
Guidance on selecting a suitable location for the pressure booster system.
Power Connection
Instructions for connecting the pump to the power supply, including voltage and wire codes.
Operational Features
Auto-retry and Water Return Modes
Explains the Torrium2's automatic restart features for loss of prime or water flow.
Electrical Power Surge Protection
Details on the MOV protection and recommendations for additional surge protection.
Pipework and System Configuration
Pipe Connections
Guidance on using appropriate pipes, unions, and avoiding thread sealing compounds.
Extra Draw-off Capacity
Information on installing additional accumulators for specific applications.
Specific Installation Scenarios
Torrium2 Check Valve Removal
Step-by-step guide to removing and modifying the inbuilt check valve for suction lift.
Connection to your Water Source
Details on connecting the pump to various water sources like cisterns or municipal supply.
Priming and Operation
Priming and Operation
Instructions on how to prime the pump and perform basic operational checks.
Maintenance
Maintenance
Regular attention required for the pressure system, including checking pressure tanks.
Trouble Shooting Check List
Trouble Shooting Check List
A guide to diagnosing and resolving common issues with the pump and controller.
After Sales Service
After Sales Service
Information on how to obtain professional after-sales service and support.
Davey Warranty
Davey Warranty
Details of the product warranty, coverage, exclusions, and claim procedures.

Table of Contents