2.3 Cabinet-Mounting Requirements

Before mounting the switch in a cabinet, make sure that the cabinet meets the following
requirements.

2.3.1 Cabinet Requirements

I. Dimensions
A standard 19-inch cabinet is required.
You can install the switch in an N68 cabinet developed by H3C. There are two types of
N68 cabinets available for the S9500 series:
N68-18 model: 1.8-meter-high N68 cabinet (600 × 800 × 1800 mm, or 23.6 × 31.5
× 70.9 in.)
N68-22 model: 2.2-meter-high N68 cabinet (600 × 800 × 2200 mm or 23.6 × 31.5 ×
86.7 in.)
Note:
For the procedure of installing and remodeling an N68 cabinet, refer to H3C N68
Cabinet Installation and Remodel Introduction.
You can also install the switch in a 19-inch cabinet provided by other vendors.
II. Weight bearing capacity and power
The cabinet must be able to bear the weight of the switch and its accessories. A 20%
power margin should be reserved.
III. Grounding requirements
You must provide a good grounding system for the switch. The cabinet must be
equipped with a grounding terminal, as shown in
Chapter 2 Preparing for Installation
Figure
2-1.
2-7

Advertisement

Table of Contents
loading

This manual is also suitable for:

S9508 fabricS9512 fabric iiS9505S9508S9512S9508v

Table of Contents