II. Example of the label
Make sure that labels are affixed in correction direction. That is, after the cable ties are
bundled onto the cable, the identification plates with the labels should face up, and the
text on the labels in the same cabinet should be in the same direction, as shown in
Figure
B-14:
TO:
A01 AC
Figure B-14 Example of the labels on the AC power cable
In
Figure
information about the position of the cable on the power socket. (2) indicates the label
on the power socket side, which carries the information about the position of the cable
on the loaded cabinet side.
On the loaded cabinet side, the label marked with "A01-AC" indicates that the power
cable is connected to the socket of Row A and Column 01 in the machine room.
On the power socket side, the label marked with "B01-AC" indicates that the power
cable is connected to the loaded cabinet of Row B, Column 01 in the machine room.
TO:
(1)
B-14, (1) indicates the label on the loaded cabinet side, which carries the
Appendix B Engineering Labels for Cables
B01 AC
(2)
B-16