Haier HR-SC Operating Instructions Manual

Haier HR-SC Operating Instructions Manual

Solar station

Advertisement

MPa
Read the operation instruction
carefully before use.
Ensure good storage of the operation
instruction for late consultation.
OPERATION INSTRUCTIONS
OPERATION INSTRUCTIONS
Haier solar station
Haier solar station
SOL H
PRE INT
WT
HC
T-DISP
ON/OFF
SET
REG
MODE
Installation cautions .......................3
Circuit connection ...........................6
and priming valve ..........................7
Priming antifreeze ...........................8
Directions for use .........................9
indication lamps ..............................9
Operation methods ........................11
data and packing sheet ................14
Technical data ...................................14
Packing sheet ....................................14
Questions and answers ................15
HR-SC
2
.....

Advertisement

Table of Contents
loading

Summary of Contents for Haier HR-SC

  • Page 1: Table Of Contents

    OPERATION INSTRUCTIONS OPERATION INSTRUCTIONS Haier solar station Haier solar station HR-SC SOL H PRE INT T-DISP ON/OFF MODE Safety information (read it before use) ..Installation introduction ....3 Installation cautions .......3 Installation of the solar station ..4 Circuit connection ......6 Installation of expansion tank and priming valve ......7...
  • Page 2: Safety Information

    • Before use, ensure that all the connection components of the pipes are sealed without leakage. • If the supply cord is damaged, it must be replaced by the manufacturer, its service agent or similarly qualified persons in order to avoid a hazard. • This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety. Haier solar station...
  • Page 3: Installation Introduction

    • Solar station must be away form strong disturbing resource (voltage equipments, communication equipments, etc.). • After adding enough antifreeze, close inlet and outlet of the priming valve and tighten the nut. • The antifreeze used in the Circulation Pipe must be in conformity to local safety and environmental protection standards or laws. • The antifreeze must be primed by the qualified technician of Haier. • The disposal of the antifreeze must be in conformity to local safety and environmental protection laws. • The antifreeze may evaporable, flammable and toxic. If find leakage of it, contact the local after-sale sectors immediately. If drink or suck it by accident, contact the medical institution and see the doctor immediately. If the skin contacts the antifreeze accidently, wash it away and contact the medical institution and see the doctor immediately. Haier solar station...
  • Page 4: Installation Of The Solar Station

    Before installation, determine the specific installation position according to the requirements of user. According to the positions and distance of the hanger holes on the back of solar station, drill two holes in the wall with percussion drill. The hole is 70mm in depth and 9mm in diameter. Then fix the hanger on the wall with two expansion bolts. Align the hanger holes on the back of solar station to the hook on the hanger and hang the solar station on the hanger. Screw off bolts on the bottom shell of solar station, open its front shell and connect it to the heat circulation system (all the inlet and outlet vents of solar station are G1/2” female standard thread). Notice Installation position on the wall of installation hanger of solar station must be fixed properly and wall supporting load must be two times of weights of solar station. The hanger holes on the back of solar station Hanger of solar station Small expansion bolt Haier solar station...
  • Page 5 Circulation liquid inlet of water storage tank Circulation liquid outlet of water storage tank Outfall Water storage tank ( The components other than solar station is only for reference) The vertical height between solar station and collector should not be greater than 10m. Notice Haier solar station...
  • Page 6: Circuit Connection

    Water storage tank Relay output sensor interface N end Signal wire interface Relay output of Display board N label Creepage detection coil interface Clamp for holding the wire Earth plate Schematic diagram of power board interface of solar station. Haier solar station...
  • Page 7: Installation Of Expansion Tank And Priming Valve

    Install one tee at the outlet of the priming valve. One end of tee is connected with circulation liquid output tube and another end is connected with expansion tank. After determination of its position, drill two holes in the wall with percussion drill. The hole is 70mm in depth and 9mm in diameter. Then fix expansion tank on the wall with two expansion bolts and corresponding fixing strap. Notice Priming valve and expansion tank are both installed on the corresponding tubes at the liquid outlet of water storage tank. Haier solar station...
  • Page 8: Priming Antifreeze

    Installation introduction Priming antifreeze Screw off the priming vent cap of priming valve, close the bigger check valve in the middle of priming valve ( when two blades on the valve handle is vertical to axle of valve, it is closed) and open another two smaller check valves. Connect the output of priming equipment with one priming inlet and ensure the flowing direction is the same with installation direction of check valve. Then Connect another priming output with returning inlet of priming equipment. Start the priming equipment for priming. Observe the returned antifreeze until uniform returned flow and no bubble is realized. At first close the check valve connected to returning inlet of priming equipment, then the check valve connected to outlet of priming equipment, and open the bigger check valve in the middle of priming valve. Disassemble the priming equipment. Notice After priming, put 3/4 fibre gasket in the priming inlet cap and tighten it to prevent the leakage of antifreeze. Haier solar station...
  • Page 9: Directions For Use

    6 seconds. Press the button for more than  ON/OFF MODE one second, the value will increase by 3 jump per second. After the setting, press the button  for confirmation or do not press any buttons for 6 seconds, the system will automatically confirm it. After pressing the button to turn off the solar station, temperature indication lights  of water storage tank and solar collector and temperature indicator are still in normal operation; other display plates and indication light will be turned off. And solar collection function is still in operation and electric heating will be closed. Haier solar station...
  • Page 10 Temperature indication light of water storage tank (yellow) „ While it is lighted up, it is indicated that temperature displayed in temperature displaying zone is current temperature of water storage tank. Temperature indication light of solar collector (red) „ While it is lighted up, it is indicated that temperature displayed in temperature displaying zone is current output water temperature of solar collector. Clock time display/ parameter setting display (green) ( A and B) „ In normal state it display current time set by the user, and the clock can be reset only under the solar energy heating mode ( green indication light of solar energy is on). Different Mode Settings will display Corresponding parameters. Temperature indicator (green) „ Display current temperature of water storage tank and solar collector in turn. Haier solar station...
  • Page 11: Operation Methods

    Set the dated time 2 . The setting method is same to setting method of time 1 . Repeat the operations in 1 and 2. Press the button again, then B twinkles; press the button to set the dated temperature for electric heating. The setting range is from 30°C to 75°C with the default value 65°C. Haier solar station...
  • Page 12 The instant heating mode is as follows: „ Press the button again, then B twinkles; press the button to set the temperature for instant heating. The setting range is from 30°C to 75°C with the default value 65°C. Directions ■ In the instant heating mode, the system will detect whether current water temperature in water storage tank reaches the set temperature, if it is lower than the set temperature, start electric heating immediately. At the same time instant heating indication light twinkles with green. While heating to the set temperature, automatically switch to solar heating mode. Then on-demand indication light is off and solar energy heating indication light is on. Notice In the instant heating mode, solar energy temperature difference circulation will be in normal operation. Haier solar station...
  • Page 13 30 minutes. Notice If water temperature continuously decrease 6°C in 30 minutes, the system will record one time of water usage. For several times in the same period part, record only one time. Cautions for use „ Inspect whether solar station and the system is in normal operation. In order to ensure good operation of solar energy water heater system and full heat storage in solar collector, do not turn off the power of solar station. If the system continuously operates for more than 2 months, it is advisable for you to calibrate the clock to ensure normal operation of presettedd heating and intelligent heating. The solar station controller has the power failure memory function. During accidental power failure, the system can restore the set parameters before power failure. Cleaning and maintenance „ After usage for certain time, wipe its shell gently with wet towel. Do not use chemical detergent to avoid shell fading. Haier solar station...
  • Page 14: Electric Principle Diagram, Technical Data And Packing Sheet

    Maximum media temperature 100°C water storage tank β (0/100)=3970K±2% Maximum electric heating power 2600W NTC, -40°C ~ 250°C Temperature sensor of Rated voltage AC 220V ~ 230V R(25°C)=100KΩ ±3% solar collector Frequency 50Hz β (0/100)=4036K ±2% Packing sheet Parts name Quantity Solar station 1 set Solar station hanger Expansion bolt Expansion tank Temperature- measuring blind tube of solar collector Fixing strap of expansion tank Haier solar station...
  • Page 15: Questions And Answers

    Check temperature sensor of solar collector for damage. Fault code shows Check temperature sensor of water storage tank for damage. Note Correct Disposal of this product: This marking indicates that this product should not be disposed with other household wastes. To prevent possible harm to the environment or human health from uncontrolled waste disposal, recycle it responsibly to promote the sustainable reuse of material resources. To return your used device, please use the return and collection systems or contact the retailer where the product was purchased, they can take this product for environmental safe recycling. Haier solar station...
  • Page 16 V98497 0040502470 V98497 0040502470...

Table of Contents