1SCS (Part No. S86-103V)
2SCS (Part No. S86-104V)
3SCS (Part No. S86-105V)
4SCS (Part No. S86-056V)
Installation
Read this entire installation manual to ensure proper installation, then file this manual
with the owner or maintenance department. Compliance and conformity to local codes
and ordinances is the responsibility of the installer.
Pressurized plumbing fixtures must be installed in accordance with manufacturer's
recommendations. The supply piping to these devices must be securely anchored to
the building structure to prevent unnecessary movement of the installed device when
operated by the user. Use extreme caution when installing the device to prevent
damage to the exposed significant surface. When drilling into masonry or other hard
materials to install wall and floor anchors, be sure to wear safety goggles.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
discarding any packaging material. If any parts are missing, do not begin installation
IS
until you obtain the missing parts.
T H
E
S ID
U P
To avoid personal injury and/or damage to the unit, turn OFF electrical power to the
outlet before beginning installation.
An optional transformer may be used in conjunction with the 900 Series Futura
faucets. Refer to the installation manual for remote transformer mounting instructions.
One transformer operates up to four faucets at one time. Additional transformer(s) are
required for installations with more than four faucets.
Flush water supply lines, then turn the water supply OFF before beginning installation.
DO NOT use pipe dope on any faucet or supply connections. Possible solenoid
contamination could occur which will void any warranty. Teflon tape is the
recommended sealant. The installation requires a water flowing pressure of at least 20
PSI but no greater than 80 PSI.
Product warranties may be found under "Product Information" on our web site at
www.bradleycorp.com.
215-1465 Rev. B; EN 06-200
© 2006 Bradley Corporation
Page 1 of 3
4/5/06
Installation
1SCS-4SCS
Surface-Mounted Cabinet with
1-4 Solenoids
For Service Only
Table of Contents
IMPORTANT!
Install Cabinet . . . . . . . . . . . . . . . . . .2
Connect Tubing and Wiring . . . . . . . .3
P.O. Box 309, Menomonee Falls, WI 53052-0309
Phone: 1-800-BRADLEY Fax: (262) 251-5817
http:\\www.bradleycorp.com
Need help?
Do you have a question about the 1SCS and is the answer not in the manual?
Questions and answers