Texas Instruments DRV7308EVM User Manual
Texas Instruments DRV7308EVM User Manual

Texas Instruments DRV7308EVM User Manual

Evaluation module

Advertisement

www.ti.com
EVM User's Guide: DRV7308EVM
DRV7308EVM Evaluation Module
Description
The DRV7308EVM is a module designed for thorough
evaluation of the DRV7308 motor driver. The device
is a 250W, 450V integrated triple GaN FET half-
bridge gate driver for motor driver applications. The
DRV7308EVM provides three 650V E-mode GaN FET
half-bridges capable of directly driving a three-phase
brushless-DC motor.
The C2000
LAUNCHXL-F2800137
required for this kit and is used to operate and
monitor the DRV7308 driver. PWM, fault response,
and further device control are provided by the
LAUNCHXL-F2800137 module.
Features
Up to 450V operating voltage with 5A peak current
drive capability
250W capability without the need for heat sink
SLVUCY8 – MAY 2024
Submit Document Feedback
Ultra low adaptive deadtime (<300ns)
Ultra low propagation delay (<135ns)
Low conduction loss with GaN FET's 205mΩ
RDS(ON) at TA = 25°C
Slew rate options from 5V/ns to 40V/ns
Integrated BRAKE functionality
Integrated temperature sensor
Integrated 12MHz, 15V/μs amplifier for single
shunt current sensing
LaunchPad
is
Applications
Residential air conditioners
Refrigerator and freezer
Small home appliances
Appliances, HVAC pumps, and fans
Dishwasher
Washer and dryer
Cooker hood
DRV7308EVM
Copyright © 2024 Texas Instruments Incorporated
Description
DRV7308EVM Evaluation Module
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DRV7308EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments DRV7308EVM

  • Page 1 Ultra low adaptive deadtime (<300ns) Description • Ultra low propagation delay (<135ns) The DRV7308EVM is a module designed for thorough • Low conduction loss with GaN FET's 205mΩ evaluation of the DRV7308 motor driver. The device RDS(ON) at TA = 25°C is a 250W, 450V integrated triple GaN FET half- •...
  • Page 2: Kit Contents

    EVM disclaimers 1.3 Specification The DRV7308EVM can support voltages up to 450V and peak currents up to 5A. To prevent damage to both the IC and the EVM, confirm that these voltage and current specifications are not exceeded. DRV7308EVM Evaluation Module SLVUCY8 –...
  • Page 3: Device Information

    (GVDD & bootstrap power supply) UVLO protection. 2 Hardware 2.1 Hardware Connections Overview - DRV7308 + LAUNCHXL-F2800137 This section describes the hardware interface of the DRV7308EVM to external supplies, motor, hall sensors, and PC through the LAUNCHXL-F2800137 LaunchPad. Figure 2-1. DRV7308EVM Block Diagram Figure 2-2 shows the correct connection between the DRV7308EVM and a LAUNCHXL-F2800137 LaunchPad.
  • Page 4 Figure 2-2. DRV7308EVM Mating to C2000 LaunchPad Figure 2-3. LAUNCHXL-F280049C Compatibility Note If desired to use the LAUNCHXL-F280049C LaunchPad with the DRV7308EVM, then remove resistors R2 and R48 from the EVM and populate R49 and R50 with 0 Ohm resistors. WARNING High voltage isolation.
  • Page 5 Figure 2-4. AC Voltage Input Rectifier Circuit The DRV7308EVM is designed for a motor input supply of up to 450 VDC and up to 5A peak drive current. The inputs connect to J5 and J10 with the noted polarity. The VM test point connects to the same node but must not be used for high current input.
  • Page 6 J7 connector. Figure 2-6. Hall Sensor Input and Power Connectors The DRV7308EVM is designed to drive a 3-phase brushless-DC motor where each phase must be connected to the J6 (OUT_X) screw terminal in the appropriate order.
  • Page 7: Jumper Configuration

    If the motor phases do not match the hall sensors or the connections are made out of order, then the motor does not spin smoothly and current consumption increases. 2.2 Jumper Configuration Figure 2-8. DRV7308EVM Jumper Hardware Configurations Name Jumper...
  • Page 8: Status Leds

    2.3 Status LEDs There are LED status indicators on the DRV7308EVM that are designed to express the current operating state of the device. The DRV7308EVM has three status LEDs on the board. By default, the GVDD_LED lights up when the board is powered on with the auxiliary power.
  • Page 9 Hardware Design Files 3 Hardware Design Files 3.1 Schematics Figure 3-1. DRV7308EVM Schematic 1 Figure 3-2. DRV7308EVM Schematic 2 SLVUCY8 – MAY 2024 DRV7308EVM Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 10 Hardware Design Files www.ti.com Figure 3-3. DRV7308EVM Schematic 3 DRV7308EVM Evaluation Module SLVUCY8 – MAY 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 11: Pcb Layouts

    Hardware Design Files 3.2 PCB Layouts Figure 3-4. DRV7308EVM Layout Board Dimensions Figure 3-5. EVM Top Overlay SLVUCY8 – MAY 2024 DRV7308EVM Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 12 Hardware Design Files www.ti.com Figure 3-6. EVM Solder Mask Figure 3-7. EVM Top Layer DRV7308EVM Evaluation Module SLVUCY8 – MAY 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 13 Hardware Design Files Figure 3-8. EVM Signal 1 Layer Figure 3-9. EVM Signal 2 Layer SLVUCY8 – MAY 2024 DRV7308EVM Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 14 Hardware Design Files www.ti.com Figure 3-10. EVM Bottom Layer Figure 3-11. EVM Bottom Solder Mask DRV7308EVM Evaluation Module SLVUCY8 – MAY 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 15 CAP, AL, 150µF, 500V, +/- 20%, TH LGN2H151MELA45 Nichicon LED, Red, SMD LTST-C170KRKT Lite-On LED, Green, SMD LTST-C170KGKT Lite-On LED, Orange, SMD LTST-C170KFKT Lite-On SLVUCY8 – MAY 2024 DRV7308EVM Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 16 RES, 2.00 k, 1%, 0.1 W, AEC-Q200 Grade 0, 0402 ERJ-2RKF2001X Panasonic R14, R70, R71, R72 RES, 330, 1%, 0.125 W, 0805 CRCW0805330RFKEAC Vishay-Dale DRV7308EVM Evaluation Module SLVUCY8 – MAY 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 17 TP1, TP2, TP3, TP4, TP5, TP6, TP7, TP9, TP10, TP29, Test Point, Miniature, Red, TH 5000 Keystone, Keystone Electronics TP32, TP34, TP35, TP40, TP41 SLVUCY8 – MAY 2024 DRV7308EVM Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 18 CAP, CERM, 1000pF, 2000V, +/- 10%, X7R, 1808 GR442QR73D102KW01L MuRata CAP, AL, 1000uF, 25V, +/- 20%, TH EKMG250ELL102MJ20S Chemi-Con D14, D15, D16 Diode, Zener, 18V, 200mW, SOD-323 MMSZ5248BS-7-F Diodes Inc. DRV7308EVM Evaluation Module SLVUCY8 – MAY 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 19 R49, R50, R51, R78, R137 RES, 0, 5%, 0.1 W, AEC-Q200 Grade 0, 0603 ERJ-3GEY0R00V Panasonic R107, R108, R109 RES, 20.0 k, 1%, 0.125 W, 0805 CRCW080520K0FKEA Vishay-Dale SLVUCY8 – MAY 2024 DRV7308EVM Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 20: Additional Information

    4.1 Trademarks C2000 ™ , LaunchPad ™ , and BoosterPack ™ are trademarks of Texas Instruments. All trademarks are the property of their respective owners. DRV7308EVM Evaluation Module SLVUCY8 – MAY 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 21 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 22 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 23 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 24 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 25 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 26 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2024, Texas Instruments Incorporated...

Table of Contents