This user's guide describes the operation of the DRV603 evaluation module. This document also provides
measurement data and design information including a schematic, bill of materials, and printed circuit board
(PCB) layout drawings.
......................................................................................................................
1
Overview
...................................................................................................................
2
Quick Setup
3
On/Off Sequence
4
Component Selection
5
Layout Recommendations
6
DRV603EVM Performance
7
Related Documentation from Texas Instruments
8
Design Documentation
1
DRV603EVM Functional Block Diagram
2
Power-Up/-Down Sequence
3
Differential Input, Second-Order, Active Low-Pass Filter
4
THD+N versus Voltage (Analog Input)
5
THD+N versus Voltage (Digital Input)
6
THD+N versus Frequency (Analog Input)
7
THD+N versus Frequency (Digital Input, 0 dBFS)
8
FFT Spectrum with –60-dBFS Tone (Analog Input)
9
FFT Spectrum with –60-dBFS Tone (Digital Input)
10
Idle Noise FFT Spectrum (Analog Input)
11
Idle Noise FFT Spectrum (Digital Input)
12
Channel Separation (Analog Input)
13
Channel Separation (Digital Input)
14
Frequency Response (Analog Input)
DirectPath is a trademark of Texas Instruments.
Blu-ray Disc is a trademark of Blu-ray Disc Association.
TOSLINK is a trademark of Toshiba Corporation.
All other trademarks are the property of their respective owners.
SLOU252A – December 2008 – Revised January 2009
Submit Documentation Feedback
DRV603EVM
............................................................................................................
.......................................................................................................
..................................................................................................
.................................................................................................
....................................................................................................
List of Figures
..................................................................................
................................................................................................
....................................................................................
.....................................................................................
................................................................................
................................................................................
.................................................................................
......................................................................................
.......................................................................................
....................................................................................
SLOU252A – December 2008 – Revised January 2009
Contents
......................................................................
...............................................................
......................................................................
...................................................................
....................................................................
User's Guide
DRV603EVM
2
3
4
5
6
6
15
15
3
4
5
8
8
9
9
10
10
11
11
12
12
13
DRV603EVM
1
Need help?
Do you have a question about the DRV603EVM and is the answer not in the manual?
Questions and answers