Page 2
From the very beginning, BLUETTI has tried to stay true to a sustainable future through green energy storage solutions while delivering an exceptional eco-friendly experience for our homes and our world. That's why BLUETTI makes its presence in 100+ countries and is trusted by millions of customers across the globe.
Page 3
The contents of this manual are subject to change without notice. Please get the latest version from: https://www.bluettipower.com/pages/user-guides If you have any questions or concerns about this manual, please contact BLUETTI support for further assistance. Shenzhen PowerOak Newener Co., Ltd.
Page 4
PV inverter< 4000w at least 2*B500; if max power of PV inverter is 4001w-6000w at least 3*B500; if max power of PV inverter is 6001w-7000w at least 4*B500; if max power of PV inverter is larger than 7000w, please contact BLUETTI.
Page 5
3. Currently , support Enphase Micro inverters IQ7 and IQ6, Solaredge SE5000H, SE6000H, SE7600H,SE10000H, SMA SUNNY BOY SB 6000TL-US / 7000TL-US / 8000TL-US /9000TL-US 240V 4. It is necessary to install a sub panel which is from BLUETTI. Brand : Reliance , 50A split phase 5.
Use only compatible: SolarEdge SE3000H, SE3800H, SE0500H, SE6000H, SE7600H,SE10000H Enphanse only IQ7 /IQ6 SB 6000TL-US / 7000TL-US / 8000TL-US /9000TL-US 240V Electrical Diagrams...
Page 7
Grid Main Panel Meter IOT BOX WIFI BOX 200A LINK PORT1 EP900 RS485 Link 485 B3 485 A3 YRDS1EL/N32/4 INS GND 12AWG 3000W 12AWG GEN NO 10AWG 6000W GEN NC 10AWG GEN COM QF2 4P 32A Normal Loads 6AWG Standard cable...
Page 8
NOTE: 1.Enphase inverters are only available for single set of EP900 ESS , not for parallel. 2.Solaredge inverters are available for both of single set of EP900 ESS , or parallel.
Page 11
Procedures Step 1: Wiring Connect the cables according to the electrical diagrams above. Connect the battery power cables, communication cables,according to the electrical diagram above. IMPORTANT: Do not connect the PV power cables, BACKUP and GRID cables at this stage. Step 2: Power on Press and hold the battery power button to activate the energy storage system.
Page 12
Step 3: Activate professional mode permissions Users need to use the professional features of the app, first register an account,then apply to become an professional user through the following link : https://h5.bluettipower.com/app/apply-vip/index.html...
Page 13
Step 4: PV-inverter Configuration Access the “ Pro Mode ” page in the app and Turn on the “Solar Inverter”...
Page 14
Step 5: Initiate Turn on the “System ON/OFF”...
Page 15
Accessories Part No. Accessory Specs Diagram Qty. Description 29.0101.015 Meter Acrel, AGF-AE-D/200, 208V / AC-coupled meter 0-00 (Optional) 240V, 60Hz, 200A±1%, L1/L2/N/PE, RS485 communication, Single-phase bidirectional meter (for US version), with 2 200A CTs 15.1501.000 CT (Optional) Acrel, AKH-0.66-K-Φ16W, 150A / Replacement for the meter's CT 1-00 5A, 2.5VA, -20°C-70°C, Red/Black...
Page 16
Software Version (minimum required version) Please upgrade to the latest firmware. EP900 ESS: ARM 502120 , DSP 501916, PBOX904311.
Need help?
Do you have a question about the EP900 and is the answer not in the manual?
Questions and answers