5925 Heisley Road • Mentor, OH 44060-1833
OPERATING and MAINTENANCE INSTRUCTIONS
Model: 120PH and 121PH "D" Series Proof/Hot Cabinets
Model No.
120PH1836D
121PHUA11D
121PH1818D
120PH1836D208
121PHUA11D208
121PH1818D208
120PH1836D240
121PHUA11D240
121PH1818D240
All are designed for AC service.
HOW TO INSTALL UNIT:
1. Place cabinet near warm ovens. Do NOT put in
drafty areas or near ventilating systems.
2. Plug cord end into proper wall outlet.
3. Fill water pan with 2 qts. (1.8 liters) of clean, hot
water.
HOW TO PROOF:
1. Fill water pan (See "How to Install")
2. Push "POWER" switch to "ON." The yellow light
will come on.
3. Push "MODE SELECTION" switch to "PROOF".
The yellow light will come on.
4. Turn "HUMIDITY" dial to No. 8.
5. Turn "AIR" dial to "OFF".
6. Preheat for 30 minutes.
7. Put fresh or fully thawed dough into cabinet.
NOTE: The cabinet temperature will drop temperature
inside cabinet if cold dough is added.
Do NOT put frozen dough into cabinet
Call Toll-free: 877-CRES COR (273-7267) • Fax: 800-822-0393 • www.crescor.com
Volts
Watts
Amps
120
1920
208
2000
240
2000
CONTROL PANEL PARTS IDENTIFICATION
1. Switch - Power
2. Yellow Light - Power
3. Thermostat - Humidity
4. Thermostat - Air
NOTE: No. 8 setting will give you an approximate
NOTE: Check water level in water pan if you are
Proof/Hot
Cabinets
Rev. 11
(10/2021)
Hertz
Phase
16.6
60
9.6
60
8.6
60
temperature of 95°F (35°C), and 90-95%
humidity. Experiment with different
"HUMIDITY" and "AIR" settings to get the
exact temperature and humidity you need. The
thermometer shows the temperature inside the
cabinet.
proofing longer than 90 minutes. Fill with
clean, hot water.
FL-2306
Page 1 of 4
NEMA
1
5-20P
1
6-15P
1
6-15P
5. Yellow Light - Proof
6. Red Light - Heat
7. Switch - Mode Selection
8. Thermometer
Need help?
Do you have a question about the 120PH D Series and is the answer not in the manual?
Questions and answers