ASSEMBLY
INSTRUCTIONS
General information
A. Surfacing requirements
This equipment should be installed on an impact
absorbing surfacing / loose fi ll material that
accords with DIN EN 1176 / EN 1176 and is
adequate for a maximum free height of fall
of ≤ 3.00 m.
B. Foundations
Please take into account the special sheet:
Notes on the construction of foundations.
Special information
- On safety:
• Certifi ed by TÜV Süd Product Service GmbH
in compliance with DIN EN 1176.
• In addition to this certifi cation, we recommend
that a diligent evaluation of the safety be
carried out following the assembly.
- Please do not alter any parts of the equipment
or the construction itself since this may aff ect
the safety standards and your guarantee.
- We reserve the right to make technical
alterations!
For further information please call your
local agent.
Attention:
These assembly instructions include
the acceptance criteria for climbing
structures.
This can be helpful for the inspector
during a potential safety check.
RICHTER SPIELGERÄTE GMBH · D-83112 FRASDORF · PHONE +49-8052/17980 · FAX 4180
·
ASSEMBLY
INSTRUCTIONS
Climbing Structure 18
Order No. 6.51018/L6.51018
The assembly of climbing structures can only
be carried out by the manufacturer or approved
assembly partners of the manufacturer.
You will receive the following documents:
- Delivery note with components
- Foundation plan with safety distances
- Perspective
- Separate assembly instructions for additional
- General instructions concerning the construction
- Sequence of assembly operations (page 3)
Please check that all documents are included!
Required space including safety distances
(DIN EN 1176)
Please pay particular attention to the foundation plan.
·
ASSEMBLY
equipment (if applicable)
of foundations
INSTRUCTIONS
Page 1