General information
A Surfacing requirements
This equipment should be installed on an
impact absorbing surfacing / loose fill material
that accords with EN 1176 and is adequate
for a maximum free height of fall of ≤ 1.00 m.
Note
If installed in sand, the equipment will not
operate properly!
B Foundations
Please take into account the special sheet:
„Notes of the construction of foundations".
Special information
Certified by TÜV Süd Product Service GmbH in
compliance with EN 1176.
Please do not alter any parts of the equipment
or the construction itself since this may affect the
safety standards and your guarantee.
We reserve the right to make technical alterations!
For further information please call your local agent.
Required space including safety distances (EN 1176)
820 x 1180 cm
Ground elevation
Scale 1:100
all dimensions in cm
Foundations
Quality of concrete C25/30
3 pieces 60 x 60 x 40 cm
Excavation depth 60 cm
2 pre-fabricated foundations
Excavation 100 x 100 x 60 cm
RICHTER SPIELGERÄTE GMBH · D-83112 FRASDORF · PHONE +49-8052/17980 · FAX 4180
ASSEMBLY
INSTRUCTIONS
beam 4
ASSEMBLY
Jackstraws See-saw
Order No. 6.50600
with steel posts
Order No. 6.50601
Components
Number of parts: 4
1 bundle: 4 balancing beams
1 bundle: 3 stand posts
1 bundle: 2 foundation plates
1 bag: shock absorber, small parts
Total weight:
Heaviest single part:
Largest single part:
beam 3
beam 2
beam 1
INSTRUCTIONS
approx. 550/670 kg
approx. 110 kg
Ø 15 - 18 cm, length 6 m
safety distance
foundations
point of
reference