Download Print this page
Watts ENWARE DET661 Installation And Maintenance Instructions Manual
Watts ENWARE DET661 Installation And Maintenance Instructions Manual

Watts ENWARE DET661 Installation And Maintenance Instructions Manual

Detention conical shower rose with extended tail

Advertisement

Quick Links

Detention Conical Shower Rose with
Extended Tail
Installation and Maintenance Instructions
DET661
technical data
Inlet Connection
Working Pressure Range
Flow Rate
Maximum Working Temperature
Enware products are to be installed in accordance with the Plumbing Code of Australia (PCA) and AS/NZS3500.
Installations not complying with PCA and AS/NZS 3500 may void the product and performance warranty provisions.
Reference should also be made to the Australasian Health Facility Guidelines (AHFG), ABCB and Local Government
regulations when considering the choice of, and the installation of these products.
This product must be installed and commissioned by a qualified plumber.
For use with potable water only.
NOTE: Enware Australia advises:
1. Due to ongoing Research and Development, specifications may change without notice.
2. Component specifications may change on some export models.
I00494_15 Feb 2024
1300 369 273 | info@enware.com.au | enware.com.au
1/2" BSP Female
Min 50 kPa
Max 500 kPa
8 L/min (3 Star WELS)
70°C (Ceramic disc)

Advertisement

loading
Need help?

Need help?

Do you have a question about the ENWARE DET661 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Watts ENWARE DET661

  • Page 1 Detention Conical Shower Rose with Extended Tail Installation and Maintenance Instructions DET661 technical data Inlet Connection 1/2” BSP Female Working Pressure Range Min 50 kPa Max 500 kPa Flow Rate 8 L/min (3 Star WELS) 70°C (Ceramic disc) Maximum Working Temperature Enware products are to be installed in accordance with the Plumbing Code of Australia (PCA) and AS/NZS3500.
  • Page 2 installation • All supply lines must be flushed thoroughly to remove debris prior to the installation of this product, as per AS/NZS 3500.1. Strainers (40 mesh) are recommended if debris is an ongoing problem. • A pressure reduction valve may be required to comply with the recommended maximum supply pressure and/or balanced pressure requirements.
  • Page 3 2. Drill a hole 22mm diameter for the all-thread. 3. Mark out location for anti-rotation pin, then drill a hole on the marked position using 5mm drill bit, 15mm deep. Check position of anti-rotation pin before drilling as orientation may vary. SEE IMAGE 03 4.
  • Page 4 maintenance CLEANING Enware products should be cleaned with a soft damp cloth using only mild liquid detergent or soap and water. Do not use cleaning agents containing a corrosive acid, scouring agent or solvent chemicals. Do not use cream cleaners, as they are abrasive. Use of unsuitable cleaning agents may damage the surface.
  • Page 5 troubleshooting FAULT / SYMPTOM CAUSE RECTIFICATION 1. Poor water flow Debris in line Dismantle shower rose and clean / reverse rinse shower rose. Dismantle flow control and clean. Replace if necessary. 2. Leaking from wall O-ring is damaged or Check and clean or replace O-ring on the base missing wall base...
  • Page 6 dimensions 1/2" BSP EXTENSION TAIL G1/2" (BSP) 260 - CUT TO SUIT ON SITE 31.5 All measurements are in millimetres. www.enware.com.au Page 6 © Enware Pty Ltd...
  • Page 7 - WATTS AUSTRALIA EFFECTIVE FROM 20 November 2023 3. Our responsibilities This Warranty Statement applies to products supplied by Australian Valve (a) In the event that the Supplier is reasonably satisfied that there is a Group Pty Ltd (ACN 068 227 270) (AVG) or Enware Pty Ltd (ACN 662...
  • Page 8 1300 369 273 info@enware.com.au enware.com.au...