TMG -ST3060V Product Manual

30' x 60' pvc fabric ceiling storage shelter

Advertisement

▶ www.tmgindustrial.com
0/20
TOLL FREE: 1-877-761-2819

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TMG-ST3060V and is the answer not in the manual?

Questions and answers

Summary of Contents for TMG TMG-ST3060V

  • Page 1 ▶ www.tmgindustrial.com 0/20 TOLL FREE: 1-877-761-2819...
  • Page 2: Main Specifications

    MAIN SPECIFICATIONS : Overall assembled size : W9.15 W9.15 x L18 x H4.57 (m) / 30 x 59.1 x 15 (ft)  Front and back roll up door : W3.65 : W3.65 x H3.3 (m) / 12 x 10.8 (ft) ...
  • Page 3 The layout of foundation(two) The layout of foundation(two).  Note: the ground anchor is installed on the the ground anchor is installed on the cement block. Baseplate layout.  ▶ www.tmgindustrial.com www.tmgindustrial.com 2/20 TOLL FREE: 1 TOLL FREE: 1-877-761-2819...
  • Page 4: Prior To Assembly

    PRIOR TO ASSEMBLY Please read the instructions carefully before installation. It is important to follow your local safety regulations and industry standards during installation. Regulations may include but are not limited to: Safety helmets, protective eyewear, and clothing  Safety harnesses for all elevated workers ...
  • Page 5 TMG-ST3060V PART LIST PARTS GRAPHICAL DESCRIPTION LENGTH LENGTH CODE Peak arch tube L2333mm Upper rafter tube L2886mm (middle truss) Upper rafter tube L2886mm (front and rear trusses) Lower rafter tube L2838mm (middle truss) Lower rafter tube L2838mm (front and rear trusses)
  • Page 6 Rope pulley L130mm L130mm Rope pulley L85mm L85mm Bottom tension bar L2560mm L2560mm (front and rear cover) Diagonal bracing bar L2070mm L2070mm (for 1st and last span) Tube clamp φ φ58mm Top cover tension tube L1993mm L1993mm 18+2 (for both bottom sides) L700 700mm L1993mm...
  • Page 7: Installation Steps

    INSTALLATION STEPS STEP 1 : REVIEW THE WHOLE STRUCTURE AND CHOOSE THE PROPER INSTALLATION SITE STEP 1 : REVIEW THE WHOLE STRUCTURE AND CHOOSE THE PROPER INSTALLATION SITE. Mark the ground in the final building location with a line showing the Mark the ground in the final building location with a line showing the positions of base plates, front doors.
  • Page 8 STEP 2 : ASSEMBLE ALL TRUSSES. The building includes 13 trusses : (1) front truss, (1)rear truss, and ( trusses : (1) front truss, (1)rear truss, and (11) middle trusses. ) middle trusses.  Install front and rear trusses.  PART PART PART...
  • Page 9 Install (11) middle trusses.  PART PART PART 1x11 1x11 2x11 8x11 2x11 2x11 ▶ www.tmgindustrial.com www.tmgindustrial.com 8/20 TOLL FREE: 1 TOLL FREE: 1-877-761-2819...
  • Page 10 Lay down all (13) trusses on the ground when the assembly is all completed and before moving to next step,  and then wrap (#26) around the sharp points of the joint to avoid friction between the fabric and the interface, resulting in fabric damage.
  • Page 11 STEP 3: PUT UP THE FRONT TRUSS. PART PART ▶ www.tmgindustrial.com www.tmgindustrial.com 10/20 TOLL FREE: 1 TOLL FREE: 1-877-761-2819...
  • Page 12 STEP 4 : PUT UP THE REST TRUSSES. Refer to Step 3 to put up the rest Refer to Step 3 to put up the rest trusses, connect all purlins (#4) with bolt (#17) and secure all bolts firmly on ) with bolt (#17) and secure all bolts firmly on ...
  • Page 13 STEP 5 : INSTALL THE DIAGONAL BRACING BARS (#13). STEP 5 : INSTALL THE DIAGONAL BRACING BARS (#13). PART PART ▶ www.tmgindustrial.com www.tmgindustrial.com 12/20 TOLL FREE: 1 TOLL FREE: 1-877-761-2819...
  • Page 14 STEP 6 : FRONT AND REAR TRUSSES TO COMPLETE. TO COMPLETE. Install rope pulley (#11A) on the right, (#11B) on the left as shown. Install rope pulley (#11A) on the right, (#11B) on the left as shown.  PART PART PART ▶...
  • Page 15 STEP 7 : INSTALL FRONT AND REAR COVER PANEL. The door cover must be zipped. Use rope (#24) to lift up the front cover (#23) from the center grommet and tie  it firm to the truss tube and spread toward both sides through each grommet along the tube. Insert the dropping tube (#15) into the bottom groove pocket on the door cover.
  • Page 16 (view from outside) PART PART PART ▶ www.tmgindustrial.com www.tmgindustrial.com 15/20 TOLL FREE: 1 TOLL FREE: 1-877-761-2819...
  • Page 17 STEP 8 : INSTALL THE TOP COVER. DO NOT INSTALL THE COVER DURING WINDY WEATHER! DO NOT INSTALL THE COVER DURING WINDY WEATHER! Unpack the top cover and place it along one of the long sides of the structure. Unpack the top cover and place it along one of the long sides of the structure. ...
  • Page 18 STEP 9 : STRETCH AND TIGHTEN TOP COVER. AND TIGHTEN TOP COVER. The roof cover must be stretched and tied to the front and rear truss by rope The roof cover must be stretched and tied to the front and rear truss by rope going through the flap grommets going through the flap grommets ...
  • Page 19 STEP 10 : TENSION THE COVER ON THE STRUCTURE FROM BOTH SIDES. STEP 10 : TENSION THE COVER ON THE STRUCTURE FROM BOTH SIDES. Insert tension tubes (#14) slowly into the bottom groove pocket on tubes (#14) slowly into the bottom groove pocket on both long sides. Add the water plug (#21) both long sides.
  • Page 20 STEP 11 : INSTALL RATCHET STRAPS. Stretch and adjust the cover from left and right, back and forth, to make sure Stretch and adjust the cover from left and right, back and forth, to make sure it is square and centered. Cut the it is square and centered.
  • Page 21: After The Installation

    AFTER THE INSTALLATION Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole shelter is well supported.

Table of Contents