Kohler Command CV17-750 Service Manual page 208

Vertical crankshaft
Hide thumbs Also See for Command CV17-750:
Table of Contents

Advertisement

Bushing
Lever
Figure 11-72. Choke Linkage Details (Two-Barrel
Models).
Figure 11-73. Throttle Linkage Details.
3. Move the governor lever toward the carburetor as
far as it will go (wide-open throttle) and hold in
position.
4. Insert a nail into the hole on the cross shaft and
rotate the shaft counterclockwise as far as it will
turn, then torque the hex nut to 6.8 N·m
(60 in. lb.).
5. Reconnect the lead wire to the fuel shut-off
solenoid if so equipped.
6. Install the lower support control bracket if
equipped with a control panel. See Figure 11-74.
Choke
Linkage
Figure 11-74. Installing Lower Support Control
Bracket.
7. Secure the control panel to the blower housing
with the two screws (Models without a Heavy-
Duty Air Cleaner). See Figure 11-75.
Figure 11-75. Installing Control Panel.
8. Assemble the throttle control shaft to the control
bracket.
9. Assemble the choke control to the control bracket.
Section 11
Reassembly
11
11.21

Advertisement

Table of Contents
loading

Table of Contents