Instructions for installation and use
2.
INSTALLATION INSTRUCTIONS, SAFETY AND HANDLING
Potential equalization / grounding
Equipotential bonding is understood as all measures for eliminating
electrical potential di erences (contact voltages), which can occur be-
tween eg two pipelines. Equipotential bonding is an important measure
for protection against electric shock.
The station is easily mounted on the wall. It is recommended
that at least two people are involve in the installation.
Note: Never lift the unit by its front insulation cover!
Easy access for setting the ECL 210/310 controller.
The control panel is removed with a single click, and al-
lows easy access to the components behind it.
The station can easily be connected to the household piping.
4 | © Danfoss | Produced by Danfoss Redan A/S | 2017.01
Akva Lux II VXi, VXi Solo HWP, VXi Solo H
Equipotential bonding reduces corrosion in the heat exchanger, in-
stantaneous water heaters, district heating stations and plumbing
installations. Equipotential bonding should be in accordance with the
provisions 60364-4-41: 2007 and IEC 60364-5-54: 2011.
Binding point is marked with a grounding symbol on the bottom right
corner of the mounting plate and there e page 31.
By removing the white front panel, easy access is provi-
ded to the display and components for regulatory and
maintenance purposes.
Through the cut-out piece in the front insulation cover
free access is provided to the pump.
The front insulation cover can easily be removed
without tools.
Please note: The VXi station is shown here with ECL 110
controller, - but it is supplied with ECL 210 or 310 controller.
VI.JV.R1.02
Need help?
Do you have a question about the Akva Lux II VXi and is the answer not in the manual?
Questions and answers