Download Print this page
Dormakaba BTS80 EMB/D Installation Instructions Manual
Dormakaba BTS80 EMB/D Installation Instructions Manual

Dormakaba BTS80 EMB/D Installation Instructions Manual

Package d, e, & f 20 minute-rated and 3-hour rated 3/4” offset hung, single acting

Advertisement

Quick Links

BTS80 EMB/D,E,F
Package D, E, & F
20 minute-rated and 3-hour rated
3/4" offset hung, single acting
Installation instructions
08059411 – 03-2021
| EN |

Advertisement

loading
Need help?

Need help?

Do you have a question about the BTS80 EMB/D and is the answer not in the manual?

Questions and answers

Summary of Contents for Dormakaba BTS80 EMB/D

  • Page 1 BTS80 EMB/D,E,F Package D, E, & F 20 minute-rated and 3-hour rated 3/4” offset hung, single acting Installation instructions 08059411 – 03-2021 | EN |...
  • Page 2: Table Of Contents

    BTS80 EMB/D,E,F Installation Instructions Table of Contents Table of contents Installation Attach install closer Install top pivot Install bottom arm in bottom of door (75323) Install spindle Install the door Templates Top pivot template Bottom arm (75323) template Cement case template...
  • Page 3: Installation

    BTS80 EMB/D,E,F Installation Instructions Closer Pivot Installation 1.1 Install closer Fig.1 Conduit Fastening screws Conduit Solenoid wire connector 1.1.1 Center closer in cement case. 1.1.2 Tighten fastening screws. 1.1.3 Install closer, cement case, and conduit in floor. 1.1.4 Pull solenoid wire through conduit. (Conduit supplied by others.)
  • Page 4: Install Spindle

    BTS80 EMB/D,E,F Installation Instructions Spindle Install door 1.4 Install spindle Fig.4 CRITICAL: WASHER MUST BE INSTALLED 1.4.1 Slide washer over tapered square end of spindle until fully seated in Spindle screw groove. 1.4.2 Fasten spindle with spindle screw Spindle provided.
  • Page 5: Templates

    BTS80 EMB/D,E,F Installation Instructions Templates Templates 2.1 Top pivot template Fig.6 4-1/4” 4-1/4” [108] [108] 1-5/32” 1-5/32” Door Leaf [29] [29] Frame Leaf 25/64” 25/64” 1-5/32” 1-5/32” [10] [10] [29] [29] 1/16” 1-5/32” 1-5/32” 11/32” Min. 11/32” clearance [29] [29] 3/16”...
  • Page 6: Bottom Arm (75323) Template

    BTS80 EMB/D,E,F Installation Instructions Templates 2.2 Bottom arm (75323) template Fig.7 Front view 5/8” [16] Finished floor 3/4” For 1/4-20 machine screws use No.7 drill. [19] For No.14 wood screws use 5/32” drill. 3/4” Four (4) holes in door.
  • Page 7: Cement Case Template

    BTS80 EMB/D,E,F Installation Instructions Templates 2.3 Cement case template Fig.8 Spindle no. Clearance 74020 1-1/8” NOTES: 74003 5/16” 74025 1-5/16” Do not scale drawing. 74005 1/2” 74030 1-1/2” Top of cement case must be flush with finish floor line.
  • Page 8: Adjustments

    BTS80 EMB/D,E,F Installation Instructions Adjustments: clearances and closing speeds Sealing compound Intermediate pivot (optional) Adjustments 3.1 Adjust bottom door clearances (if necessary) Fig.9 3.1.1 Closer can be raised approximately 5/32” with the cement case. 3.1.2 Loosen fastening screws “A”.
  • Page 9: Covers

    BTS80 EMB/D,E,F Installation Instructions Covers Operation Electrical specifications Covers 4.1 Install cover Fig.13 4.1.1 Install cover plate or threshold. 4.1.2 Trim cover plate as required to match profile of pivot jamb. 4.1.3 Install cover plate with four screws provided.
  • Page 10 DORMA USA, Inc. T: 800-523-8483 www.dormakaba.us...

This manual is also suitable for:

Bts80 emb/eBts80 emb/f